Laserfiche WebLink
SWRCB, January 2002 0 0 Page of <br />4. TANK ANNULAR TESTING <br />Test Method Developed By: <br />X Tank Manufacturer <br />❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure <br />X Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Gast Vacuum Pump/Vacuum Gauge in Hg. <br />Equipment Resolution: -1/2" x 30" Hg. <br />MEN= <br />INEENNESSIOM <br />1&2 Tank # <br />Tank # <br />Tank # <br />rCapacity."!7 <br />Yes NoYes <br />No <br />❑Yes ❑ No <br />❑Yes ❑No <br />lit 12/8 <br />Tank Material: <br />Glass/Steel <br />Tank Manufacturer: <br />Trusco <br />Product Stored: <br />Regular 87/Super 91 <br />Wait time between applying <br />30 Minutes <br />vacuum and starting test: <br />Test Start Time: <br />10:25 <br />Initial Reading (RI): <br />-10 Hg. <br />Test End Time: <br />12:25 <br />Final Reading (RF): <br />-10 Hg. <br />Test Duration: <br />2 Hours <br />Change in Reading (RF-Ri): <br />0 Hg. <br />Pass/Fail Threshold or Criteria: <br />No Loss in Hg. <br />Test Result: X Pass ❑ Fail Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />Was sensor removed for testing? X Yes ❑ No ❑ NA Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No [INA <br />Was sensor properly replaced and X Yes ❑ No ❑ NA Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />20K Split Compartment Tank, 12k 87, 8K 91. Single Annular! <br />' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />testing. (California Code of Regulations, Title 23, Section 2637(a)(6)) <br />