My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
2300 - Underground Storage Tank Program
>
PR0504388
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:37:30 PM
Creation date
6/23/2020 6:56:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0504388
PE
2361
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
01
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504388_1605 S EL DORADO_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specie) <br />Test Equipment Used: Pressure Gauges in PSI/Nitrogen Equipment Resolution: 1/10-15 PSI <br />Piping Run #1 <br />Piping Run #2 Piping Run# <br />Piping Run# <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />100' <br />90' <br />Product Stored: <br />Regular 87 <br />Super 91 <br />Method and location of <br />piping -run isolation: <br />Test boot at STP# 1 <br />Test boot at STP#2 <br />Wait time between applying <br />pressure and starting test: <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />10:30 <br />10:20 <br />Initial Reading (R,): <br />3 PSI <br />3 PSI <br />Test End Time: <br />11:30 <br />11:20 <br />Final Reading (RF): <br />3 PSI <br />3 PSI <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (RF -R,): <br />0 PSI <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in PSI <br />No Loss in PSI <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail Pass ❑ Fail <br />Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.