My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
2300 - Underground Storage Tank Program
>
PR0504388
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:37:30 PM
Creation date
6/23/2020 6:56:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0504388
PE
2361
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
01
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504388_1605 S EL DORADO_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />0 PSECTION 11.2 FUEL PUMP .,kND DISPENSER I\STALLATION <br />PART 1-GEN,-ERAL <br />1.01 DESCRIPTION <br />A. This Section describes the general requirements for handling, storage, installation, <br />testing and identification of fuel pumps and dispensers. The pumps and or dispensers shall <br />be identified with the proper decals and labels as required by State and local regulations <br />and to allow the users of the system to readily identify the appropriate dispenser. <br />B. All equipment shall be installed according to manufacturer's specifications. <br />1.02 GENER.,kL <br />A. All products and equipment furnished must be verified in writing by the Engineer prior to <br />installation. <br />B. Handling- and installation of the equipment shall be subject to approval by the Engineer. <br />C. The Contractor shall be responsible for unloading- equipment from the common cagier. <br />• removing equipment from its shipping containers and preparing equipment for installation. <br />D. The Contractor shall inspect all equipment to ascertain that there is no visible damage; that <br />sizes, model numbers, and' dimensions are as specified in the engineering data: and that all parts <br />are received as noted in packing lists. Contractor shall perform visual inspection, air pressure or <br />soap testing as required to confirm integrity of components prior to accepting delivery. <br />E. The Contractor shall provide protection against deterioration, rust. damage, and theft of all <br />equipment held in open storage prior to installation or exposed to weather or adverse conditions <br />after installation. and the Contractor shall install and remove temporary screens or covers <br />required to prevent entrance of injurious material or damage to the mechanical equipment. <br />F. The Contractor shall furnish all tools, chains, jacks. levels, micrometers, shims. wedges, and <br />other such items required for proper handling and alignment of mechanical equipment. <br />1.03 SUBMITTALS <br />A. Results of tests specified herein to be performed by the Contractor shall be submitted <br />promptly upon completion of the tests. <br />B. Shop Drawings and Specifications for all equipment installed shall be submitted to the <br />• Engineer. <br />709s1121 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.