My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
2300 - Underground Storage Tank Program
>
PR0504388
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:37:30 PM
Creation date
6/23/2020 6:56:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0504388
PE
2361
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
01
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504388_1605 S EL DORADO_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® SECTION l 1.2 FUEL PUMP AND DISPENSER INSTALLATION <br />G. The Contractor shall install machinery guards provided by the equipment manufacturer, <br />guards shown on engineering drawings, or as specified by the Owner's representative. The <br />Contractor shall check installed guards for firm mounting to ensure that proper clearances are <br />maintained. and that access for lubrication, revolution counter, maintenance, and other like items <br />are properly positioned. <br />H. The Contractor shall firmly attach plate fabricated equipment items to supporting members <br />and stiffen as required to relieve undue stresses and vibration. The Contractor shall install all <br />gaskets where required and as indicated by engineering and vendor drawings. All welding shall <br />be performed by personnel qualified for the class of Work to which they are assigned. <br />1. Before operating mechanical equipment, the Contractor shall remove all construction <br />debris in the area of the equipment; check the equipment for interferences, foreign materials, and <br />excessive stresses. check moving elements for proper freedom of movement, direction of <br />rotation. and other like operations; and make adjustments as required by codes or Specifications. <br />J. The Contractor shall maintain a log of information (in accordance with manufacturer's or the <br />owners rep's. recommendation) relative to installation and alignment of the equipment, including <br />AMNL items such as difficult or special procedures required; location of alignment markings, <br />benchmarks, and other like items for reference in future alignment checks of major equipment; <br />installation deviations; and like data. Upon completion of the Work, the Contractor shall transmit <br />said log to the Engineer. <br />3.03 TESTING <br />A. All testing and commissioning shall be performed in accordance with manufacturer's <br />engineering specifications or as directed by the Engineer. <br />B. Certification Requirement. Contractor shall certify in writing to the Engineer, that the <br />installation was properly performed in accordance with the manufacturer's requirements and <br />current environmental protection laws and regulations. <br />3.04 FIELD TOUCH-UP PAINTING <br />A. The Contractor shall touch up chips and scratches in painted surfaces of mechanical <br />equipment with paint matching the original manufacturer's paint type and color as nearly as <br />possible. Chips and scratches in the painted surfaces of field -fabricated steel shall also be <br />touched up with matching paint by the Contractor. <br />END OF SECTION <br />• <br />709S1125 <br />5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.