My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
2300 - Underground Storage Tank Program
>
PR0504388
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:37:30 PM
Creation date
6/23/2020 6:56:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0504388
PE
2361
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
01
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504388_1605 S EL DORADO_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWkCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />0 Page of <br />Test Method Developed By: 11 Piping Manufacturer )L Industry Standard El Professional Engineer <br />11 Other (Specie) <br />Test Method Used: ,Pressure 11 Vacuum El Hydrostatic <br />11 Other (Specify) <br />Test Equipment Used: NITROGEN <br />Equipment Resolution: PSI <br />IM-l"o, <br />WE, MEAMMM111101u, <br />I Piping Run # 87 <br />Piping Run# 91 <br />Piping Run# <br />MR'M� <br />Piping Run # <br />Piping Material: <br />FIBERGLASS <br />FIBERGLASS <br />Piping Manufacturer: <br />SMITH <br />SMITH <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />100, <br />100, <br />Product Stored: <br />FUEL <br />FUEL <br />Method and location of <br />piping -run isolation: <br />BOOTED, SUMPS <br />BOOTED, SUMPS <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />1128 <br />1145 <br />Initial Reading (Rj): <br />5 PSI <br />5 PSI <br />Test End Time: <br />1228 <br />1245 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />Test Duration: <br />I HR <br />I HR <br />Change in Reading (RF -R,): <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />Test Result: <br />Pass El Fail <br />A Pass [I Fail <br />El Pass [I Fail <br />El Pass El Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.