Laserfiche WebLink
SWkCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />0 Page of <br />Test Method Developed By: 11 Piping Manufacturer )L Industry Standard El Professional Engineer <br />11 Other (Specie) <br />Test Method Used: ,Pressure 11 Vacuum El Hydrostatic <br />11 Other (Specify) <br />Test Equipment Used: NITROGEN <br />Equipment Resolution: PSI <br />IM-l"o, <br />WE, MEAMMM111101u, <br />I Piping Run # 87 <br />Piping Run# 91 <br />Piping Run# <br />MR'M� <br />Piping Run # <br />Piping Material: <br />FIBERGLASS <br />FIBERGLASS <br />Piping Manufacturer: <br />SMITH <br />SMITH <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />100, <br />100, <br />Product Stored: <br />FUEL <br />FUEL <br />Method and location of <br />piping -run isolation: <br />BOOTED, SUMPS <br />BOOTED, SUMPS <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />1128 <br />1145 <br />Initial Reading (Rj): <br />5 PSI <br />5 PSI <br />Test End Time: <br />1228 <br />1245 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />Test Duration: <br />I HR <br />I HR <br />Change in Reading (RF -R,): <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />Test Result: <br />Pass El Fail <br />A Pass [I Fail <br />El Pass [I Fail <br />El Pass El Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />