Laserfiche WebLink
SWWCB, January 2002 <br />� I <br />6. PIPING SUMP TESTING <br />0 Page of <br />Test Method Developed By: 11 Sump Manufacturer XIndustry Standard 11 Professional Engineer <br />El Other (Specify) <br />Test Method Used: 11 Pressure 0 Vacuum XHydrostatic <br />E Other (Specify) <br />Test Equipment Used: INCON TS STS <br />Equipment Resolution: .0001" <br />Ilii 7 No <br />1, V <br />0 <br />"IN <br />/Sump <br />87 <br />Sump 91 <br />Sump # <br />Sump # <br />Sump Diameter: <br />36 <br />36 <br />Sump Depth: <br />62 <br />62 <br />Sump Material: <br />FIBERGLASS <br />FIBERGLASS <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />1719 <br />1599 <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />1799 <br />1791 <br />Condition of sump prior to testing: <br />GOOD <br />GOOD <br />Portion of Sump Tested' <br />1999 <br />1999 <br />Does turbine shut down when <br />sump sensor detects * liquid (both <br />product and water)? <br />IK Yes El No 11 NA <br />W Yes El No 0 NA <br />E Yes Ll No 11 NA <br />0 Yes 0 No E NA <br />Turbine shutdown response time <br />4 SEC <br />4 SEC <br />Is system programmed for fail-safe <br />shutdown?* <br />A Yes El No 0 NA <br />;f Yes El No El NA <br />11 Yes El No El NA <br />0 Yes 11 No 11 NA <br />Was fail-safe verified to be <br />operational?* <br />4 Yes 11 No E NA <br />2(Yes E No El NA <br />[]Yes DNo ENA <br />E Yes El No [I NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5 MIN <br />5 MIN <br />Test Start Time: <br />1247 <br />1036 <br />Initial Reading (Ri): <br />4.5736 <br />0.5858 <br />Test End Time: <br />1302 <br />1051 <br />Final Reading (RF): <br />4.5741 <br />0.5861 <br />Test Duration: <br />15 MIN <br />15 MIN <br />Change in Reading (RF -R,): <br />.0005 <br />.0003 <br />Pass/Fail Threshold or Criteria: <br />.002 <br />.002 <br />Test Result: <br />M Pass 0 Fail <br />JR Pass 0 Fail <br />0 Pass []Fail <br />E Pass 0 Fail <br />Was sensor removed for testing? <br />17 Yes 11 No 0 NA <br />4 Yes El No 11 NA <br />11 Yes El No 11 NA <br />El Yes 0 No E NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />XYes E]No EINA IXYes <br />DNo EINA I <br />E]Yes []No [INA <br />[]Yes ENo [INA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />