Laserfiche WebLink
NEW ''' INSTALLATION INSPECTION FML )RD <br /> MFACILITY NAME: , ADDRESS: <br /> SWEEPSS TANKS ULS TANK MODEL/MATERIAL: <br /> CAPACITY: PRODUCT: R-E.N_S: <br /> A I <br /> P N ALL TANKS TO BE INSTALLED ACID TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> O I <br /> V A 1 <br /> E L <br /> D S e <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1- UST PLANS SUBMITTED/ FEES PAID (H--S CODE 25287, CCR 2635 (D) (8) <br /> 2- UST INSTALLATION PLANS APPROVED CCCR 2635 (E) (5)) <br /> INITIAL INSPECTIONS <br /> ® / 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: SOAP: PSI: HRS/MIN: BRINECLIQUID ANNULAR): OTHER: <br /> / 4. PRIMARY TANK TEST: PSI: 2 HRSJNIN: <br /> z41 5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) , 1 (CCR 2635 (8) (4)) <br /> 7. SECONDARY PIPING CONTAINMENTTESTPSI: HRS/MIN: OTHER: (CCR 7.635 (A) (4)) <br /> 51 b <br /> 8_ LAKE TEST ON ALL SLNPS (24 HR. MINIMUM) HRS: (CCR 2635 (A)) <br /> 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED CCCR 2635) <br /> 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br /> 11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br /> _ FINAL INSPECTION <br /> 12- PERFORMANCE TEST FOR -ALL- MONITORING PROBES (CCR 2632 (C) (2)) <br /> 13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br /> 14. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br /> WAI 15- PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2635 (6) (5)) <br /> 16_ BALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br /> nd 17. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br /> 18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCX D AND WATERTIGHT) (CCR 2631 (D) (5)) <br /> 19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br /> 20. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (E) (1) C2)) <br /> 21. "C® FORM COMPLETED AND SUBMITTED (CCR 2635 (E)) <br /> 22. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641-2644) <br /> 23. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284 (E) (F)) <br /> COMMENTS: Z4 a /s 9`7 2-21 Z <br /> EH23-006 3/92 (REVISED 11\92) <br /> 8 <br />