Laserfiche WebLink
NEW UimL INSTALLATION INSPECTION )RD <br /> FACILITY MIAME: qw ADDRESS: <br /> Pi <br /> SWEEPS# TAMM(# Ul# TANK 14WELINATERYAI• <br /> CAPACITY: PRODUCT: R.E.H.S: <br /> A I <br /> P M ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 % El <br /> V A �s <br /> E L <br /> D S �gl <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1. UST PLANS SUBMITTED/ FEES PAID (N+S CODE 25287, CCR 2635 (D) (8) <br /> 2. UST INSTALLATION PIANS APPROVED (CCR 2635 (E) (5)) <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br /> /9 4. PRIMARY TANK TEST: PSI: HRS/NIM: <br /> LA 5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) f (CCR 2635 (B) (4)) <br /> 7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIH:6 0 OTHER: (CCR 2635 (A) (4)) <br /> 8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (A)) <br /> 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br /> s 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br /> 11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br /> FINAL INSPECTION <br /> 12. PERFORMANCE TEST FOR •ALL■ MONITORING PROBES (CCR 2632 (C) (2)) <br /> 13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br /> 14. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (8) (5)) <br /> 15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT—OFF (CCR 2635 (8) (5)) <br /> 16. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br /> 17. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br /> 18. TANK ACCESS PORTS BROUGHT TO GRADE (LOC E.D AND WATERTIGHT) (CCR 2631 (D) (5)) <br /> 19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br /> 20. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (E) (1) (2)) <br /> 21. 1°C' FORM COMPLETED AMID SUBMITTED (CCR 2635 (E)) <br /> 22. MOINITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641-2644) <br /> 23. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284 (E) (F)) <br /> CCM MEHTS: <br /> EH23-006 3/92 (REVISED 11\92) <br /> 8 <br />