My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2011-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 4:50:00 PM
Creation date
6/23/2020 6:57:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2013
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2011-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� s <br />SWRCB, January 2002 Page of <br />4_ SFCnNnARV PIPF, TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />X Other (Spec) SWRCB <br />Test Method Used: X Pressure❑ Vacuum ❑ Hydrostatic <br />LiOther (Spec <br />Test Equipment Used: Nitrogen, 0-15 PSI Test Gauge Equipment Resolution: <br />Piping Run # T-1 DO <br />Piping Run # <br />Piping Run # <br />Piping Run # <br />Piping Material: <br />FRP <br />Piping Manufacturer: <br />Smith <br />Piping Diameter: <br />4" over 3" <br />Length of Piping Run: <br />330' <br />Product Stored: <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Term. Boots <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 min. <br />Test Start Time: <br />0900 <br />Initial Reading (R,): <br />5 PSI <br />Test End Time: <br />1 <br />1100 <br />Final Reading (RF): <br />5 PSI <br />Test Duration: <br />120 minutes <br />Change in Reading (RF-Ri): <br />None <br />Pass/Fail Threshold or <br />Criteria: <br />Hold 5 PSI <br />Test Result. <br />X Pass ❑ Fail <br />❑Pass 0ail <br />❑Pass ❑Fail <br />❑Pass ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Test boots installed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.