Laserfiche WebLink
SWRCB, January 2002 <br />Page of <br />UDC Manufacturer: <br />XYes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />UDC Material: <br />FRP <br />UDC Depth: <br />30" <br />❑ Yes []No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />11" <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />N/A <br />Condition of UDC prior to <br />Fair <br />Portion of UDC Tested' 11 2" above hightest <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?` <br />XYes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown'? <br />XYes ❑ No ❑ NA <br />❑ Yes []No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No XNA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />30 Min <br />Test Start Time: <br />12:22/12:45 <br />Initial Reading (RI): <br />6.0742/6.0741 <br />Test End Time: <br />12:37/13:00 <br />Final Reading (RF): <br />6.0739/6.0747 <br />Test Duration: <br />15 min <br />Change in Reading (RF -RI): <br />-0.0003/+0.0006 <br />Pass/Fail Threshold or Criteria: <br />+/-0.002 <br />Test Result: <br />X Pass ❑ Fail <br />❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />XYes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />XYes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Test boots installed Removed after testim4. <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />