My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2011-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 4:50:00 PM
Creation date
6/23/2020 6:57:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2013
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2011-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Analog Gauge Equipment Resolution: +/-0.25 <br /> SEEM= Piping Run# S-T1-T2 Piping Run# S-T2-T3 Piping Run# V-T2T Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 15' 15' 15 minutes <br /> Product Stored: Diesel Diesel Diesel <br /> Method and location of STP 1 to STP 2 STP 2 to STP 3 STP 2 to STP 3 <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 10:00am 10:20 am 10:30am <br /> Initial Reading(RI): 5.0 psi 5.0 psi 5.0 psi <br /> Test End Time: 11:00am 11:20am 11:30am <br /> Final Reading(RF): 5.0 psi 5.0 psi 5.0 psi <br /> Test Duration: 1 hour 1 hour 1 hour <br /> Change in Reading(RF-RI): 0.0 psi 0.0 psi 0.0 psi <br /> Pass/Fail Threshold or 0.0 psi 0.0 psi 0.0 psi <br /> Criteria: <br /> Test Result: ® Pass 0 Fail N Pass 0 Fail ® Pass D Fail 0 Pass G Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> * Unable to test following secondary lines due to missing boots: Diesel Tank#1, Diesel Tank#2, Diesel Tank#3 <br /> 87 Unleaded Tank#4, 91 Unleaded Tank#5, Diesel Tank#6 and Vent line from Tank#1 to Tank#2. <br /> HEALTH DE RT ,, <br />
The URL can be used to link to this page
Your browser does not support the video tag.