Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum 9 Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Incon Incon TS-STS Tester Equipment Resolution: +/-0.002" <br /> Sump# D-Tank#1 Sump# D-Tank#2 Sump# D-Tank#3 Sump# 87 Tank#4 <br /> Sump Diameter: 42" 42" 42" 42" <br /> Sump Depth: 75" 72" 73" 71" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 23" 20" 13" 5" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 43" 44" 43" 41" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry Dry <br /> Portion of Sump Tested' 45" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑Yes ❑No ®NA ❑Yes ❑No ®NA 0 Yes 0 No ®NA ❑Yes ❑No ®NA <br /> shutdown?` <br /> Was fail-safe verified to be ❑Yes []No ®NA ❑Yes ❑No ®NA 0 Yes 0 No ®NA ❑Yes ❑No ®NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 minutes <br /> test: <br /> Test Start Time: 11:51am 12:10pm <br /> Initial Reading(RI): 1.3406" 1.3408" <br /> Test End Time: 12:07 pm 12:25 pm <br /> Final Reading(RF): 1.3407" 1 1.3407" <br /> Test Duration: 15 Minutes Each (30) <br /> Change in Reading(RF-R,): 0.0001 -0.0001 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" <br /> Test Result: 0 Pass 0 Fail 0 Pass ❑Fail 0 Pass ©Fail 9 Pass 0 Fail <br /> Was sensor removed for testing? ❑Yes ❑No [RNA ❑Yes ❑No X NA ❑Yes ❑No ®NA ®Yes ❑No ❑NA <br /> Was sensor properly replaced and ❑Yes ❑No [RNA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ®Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> * Unable to test: STP Diesel Tank#1,Tank#2 and Tank#3 due to missing boots. <br /> HEALTH DERAJFITMEENT <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />