Laserfiche WebLink
El <br />Ll <br />SWRCB, January 2002 <br />Page 7 of 14 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑ Piping Manufacturer X Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />X Pressure <br />❑ Other (Spec) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: Analog Gauge <br />Equipment Resolution: +/- 0.25 <br />Piping Material: <br />Piping Run # 28SAT <br />Fiberglass <br />Piping Run # 29SAT <br />Fiberglass <br />Piping Run # 30SAT Piping Run # <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />15, <br />15, <br />15, <br />Product Stored: <br />Diesel <br />Diesel <br />Diesel <br />Method and location of <br />piping -run isolation: <br />28 Main to 28 Sat <br />29 Main to 29 Sat <br />30 Main to 30 Sat <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15min <br />15min <br />15min <br />Test Start Time: <br />4:30pm <br />4:50pm <br />11:45am <br />Initial Reading (RI): <br />5.00 psi <br />5.00 psi <br />5.00 psi <br />Test End Time: <br />5:30pm <br />5:50pm <br />12:45pm <br />Final Reading (RF): <br />5.00 psi <br />5.00 psi <br />5.00 psi <br />Test Duration: <br />1 hr <br />1 hr <br />1 hr <br />Change in Reading (RF -RI): <br />0.00 psi <br />0.00 psi <br />0.00 psi <br />Pass/Fail Threshold or <br />0.00 psi <br />0.00 psi <br />0.00 psi <br />[Criteria: <br />Test Result: <br />ICPass ❑ Fail <br />® Pass ❑ Fail <br />19 Pass ❑ Fail ❑ Pass ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />N IL BMW= lzmW <br />N 201 <br />1112ONMENITAl 1� ALT <br />DEPARTMENT <br />