Laserfiche WebLink
SWRCB, January 2002 Page 8 of 14 <br />6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum X Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: INCON TS -STS <br />Equipment Resolution: +/- 0.002" <br />IE= Sump # T5- 91 STP <br />Sump Diameter: 42" <br />Sump # T6- D STP <br />Sump # <br />Sump # <br />42" <br />Sump Depth: 82" <br />79" <br />Sump Material: Fiberglass <br />Fiberglass <br />a!� <br />Height from Tank Top to Top of 15" <br />Highest Piping Penetration: <br />13" <br />Height from Tank Top to Lowest 49„ <br />Electrical Penetration: <br />45" <br />lad <br />Condition of sump prior to testing: Dry <br />Dry <br />Portion of Sump Tested' 55" <br />54" <br />- <br />Does turbine shut down when <br />sump sensor detects liquid (both ❑ Yes []No X NA <br />product and water)?* <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No IJ NA <br />❑ Yes ❑ No J NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown? ❑Yes []NoNA <br />[]YesElNo X NA <br />11 Yes ElNo A NA <br />❑Yes 71No A NA <br />Was fail-safe verified to be ❑ Yes ❑No R NA <br />o erational?* <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No A NA <br />❑ Yes ❑ No 9 NA <br />Wait time between applying <br />pressure/vacuum/water and starting 15min <br />test: <br />15min <br />Test Start Time: - <br />1:02pm <br />Initial Reading (RI): - <br />2.1899" <br />Test End Time: - <br />1:17pm <br />Final Reading (RF): - <br />2.1898" <br />Test Duration: 15min <br />15min <br />Change in Reading (RF -RI): - <br />0.0001" <br />Pass/Fail Threshold or Criteria: +/- 0.002" <br />+/- 0.002" <br />Test Result: ❑ Pass 91 Fail <br />10 Pass - ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass : ❑ Fail <br />Was sensor removed for testing? R Yes []No ❑ NA <br />X Yes ❑ No ❑ NA <br />❑ Yes ❑ No X NA <br />❑ Yes ❑ No 'X NA <br />Was sensor properly replaced and ® Yes []No ❑ NA X Yes ❑ No ❑ NA ❑ Yes ❑ No X NA ❑ Yes ❑ No X NA <br />verified functional after testi n ? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for ailed tests) <br />T5- 91 STP Sump Failed, needs more repairs done & re -tested. <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />