Laserfiche WebLink
r Iy <br />?•''-��''•�?a SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.s*_ ov.orq/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Inspection Date: <br />t__ � <br />��,� <br />Ito <br />Facility drest: <br />Service Request #: <br />1., 1�� L ���3 <br />5`( � � <br />Onsite Service Technician's Name: <br />ICC Service Teclinicianfinstaller Exp. Date: <br />Manufacturer Training: <br />❑ <br />❑ mechanical Model: <br />SERVICE <br />o <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT NY TIME AT EHD'S CURRENT HOURLY RATE. <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model.- <br />odel:❑ <br />Elfail safe Serial #: <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />❑ This UST facility is APPROVED to operate <br />SERVICE <br />o <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT NY TIME AT EHD'S CURRENT HOURLY RATE. <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />I'ITjIjI,,,/,/ heUDC(S) cK I Piping <br />Sump(s) UST(s) <br />Testing for the above components are next due by: <br />A) /A:: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />Other: see below <br />❑ This UST facility is NOT APPROVED to operate <br />.5t <br />o <br />e �,Il ►� I f ig <br />P42 n r; <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT NY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Inspector: <br />Received By: <br />Title: <br />TN <br />{ A <br />EHD 23-04 07 <br />Rev 4/30/12 <br />UST SERVICE REQUEST INSPECTION REPORT <br />