My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6437
>
2300 - Underground Storage Tank Program
>
PR0506004
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 4:07:28 PM
Creation date
6/23/2020 6:57:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506004
PE
2361
FACILITY_ID
FA0007140
FACILITY_NAME
FLAG CITY SHELL*
STREET_NUMBER
6437
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532019
CURRENT_STATUS
01
SITE_LOCATION
6437 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506004_6437 W BANNER_2008-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRC3B,January 2002 Page of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: ank Manufacturer ❑Industry Standard ❑Professional Engineer <br /> e (Sped) <br /> Test Method Used: ❑Pressure Vacuum ❑Hydrostatic <br /> ❑Other(peck) <br /> Test Equipment Used: cuuu. � ,,tu"w (,amu .g ;kt 1 Equipment Resolution: t <br /> da Ta.n.k#an{#I- <br /> Tank# Z\t ank# �r. red <br /> Is Tank Exempt From Testing?' ❑Yes o ❑Yes o ,E]Yes ❑No ❑Yes ❑No/ <br /> Tank Capacity: 1�.. Za <br /> Tank Material: (I%y S 1.5') ; l <br /> Tank Manufacturer: C.�r��1ef_5J <br /> .Product Stored: 4- <br /> Wait time between applying <br /> press Stes <br /> acu ater and <br /> startin <br /> Test Start Time: 9 <br /> Initial Reading(Ri): M l f — (01(2 <br /> Test End Time: 3 s g <br /> Final Reading(RF): (O/ l 0 <br /> Test Duration: 1 Ott, to v <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or Criteria: No &55 rN ! NU (ass my,1 <br /> Test Result: 4 Pass- ❑ ail Pass ❑ ail Pass ❑ ail Pass ❑ ail <br /> Was sensor removed for testing? es ❑No ❑NA es ❑No ❑NA es ❑No NA Yes ❑No NA <br /> Was sensor properly replaced and <br /> verified functional after testing? 'es ❑No ❑NA es ❑No ❑NA Yes ❑No ❑ A Yes ❑No ❑ A <br /> COmments—(include information on repairs made prior to testing, and recommended follow-up ror failed tests) <br /> ' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. (California Code of Regulations,Title 23, Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.