Laserfiche WebLink
SWRCB,January 2002 Page 3 of g <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> Ot�er(Sped) <br /> Test Method Used: q. essure ❑Vacu ❑Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used / ✓�9SGlr r��G l /)7 %i' Equipment Resolution: 1 e) - t ✓�� °° <br /> ��A';-.tet'bh� ,���3,'�Y�" y t'� f k;�t _., � >.,. .:,•;dP sC: . , , • , , <br /> Piping Run#,j- Piping Run# ZPiping Run# � "VipingRun# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: 3 , <br /> Length of Piping Run: �c`�D *rOY- 2C,5 , 7v <br /> Product Stored: e !�✓ y d�,��,� <br /> Method and location of Iu - -, <br /> i in -run isolation: o "V , t. <br /> Wait time between applying <br /> W-testr: <br /> um/water and <br /> u � � ! <br /> Test <br /> Start Time: r' 3 S �_ <br /> Initial Reading(Ri): 5-,4)5 Z7 <br /> Test End Time: f(} % 3 5--- <br /> Reading(RF): i 5 -T. <br /> Test Duration: Gt 61 beAK <br /> p�t 'a <br /> Change in Reading(RF-RI): PS r- P.5Pass/Fail Threshold or <br /> Criteria: tv a 6S5 r� 1',Sz-' Uri ��SSs , re>'S D ZWPv/f1S ` <br /> Test Result: ;,6 Pass ❑Fail Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail <br /> Comments-(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />