Laserfiche WebLink
SWR6,January 2002 Page q of g <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard 7ofessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum \�drostatic <br /> ❑Other(Spec) f <br /> Test Equipment Used ¢ <br /> �. ( , - I Equipment Resolution: <br /> Sump#� Sump# Z_ Sump# 3 Sump# <br /> Sump Diameter: 11 Z ,, <br /> Sump Depth: <br /> Sump Material: ,G lye✓ / / <br /> Height from Tank Top to Top of <br /> Hi est Piping Penetration: / 3 ' y '/ 13 <br /> Height from Tank Top to Lowest r <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' t e.'� Q 1�1/ '` GJ i�r a 1 r r, e k, !/W <br /> !P ( ' , <br /> Does turbine shut down when <br /> sump sensor detects liquid(both es ❑No ❑NA es ❑No ❑NA U4es ❑No ❑NA ❑Y ❑ o ❑NA <br /> P—ro and water)?* <br /> Turbine shutdown response time K-k K lel <br /> Is system programmed for fail-safe ek s111111s ❑No ❑ <br /> shutdown?` NA ❑No ❑NA [,jes No NA Yes 1�4No ❑NA <br /> Was fail-safe verified to be <br /> a? ❑Yes ❑NA ❑Yes ❑NA ❑Ys ( ❑NA ❑YesNo 01 NA <br /> Wait time between a lying <br /> pressure/vacu ater d starting <br /> test: /D <br /> Test Start Time: <br /> Initial Reading(RO: f 4` c l°r, c Fr ✓' <br /> Test End Time: /0, ; lJ PJ /0"/0 u v <br /> Final Reading(RF): v' --� <br /> Test Duration: � oy 1_ { <br /> Change in Reading(RF-RI): Y, /`f p G.�, Nv Com, rr<7 <br /> Pass/Fail Threshold or Criteria: ods' d q,,h e a d� oe S, <br /> Test Result: Pass ❑Fail Pass ❑Fail. Pass ❑Fail Pass ❑Fa 1 <br /> Was sensor removed for testing? VYes ❑No ❑NA kyes ❑No ❑NA ' es ❑No ❑NA Yes ❑No ❑ <br /> Was sensor properly replaced and Yes ❑No ❑NA es ❑No ❑NA es ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified fimctional after testis ? <br /> Comments—(include information on repairs made prior to testing; and recommended follow-up or failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer toy of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />