My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 1J UG UU-J1101 11RV1Y1 nEA11 VV11o1AUV11V1V 1UU <br /> n , <br /> SWRCB,January 2002 Page of <br /> 7, UNDER-DISPENSER CONTA NT TESTING <br /> Test Method Developed By: UDC Manufacturer Industry Stan Professional Engineer <br /> Other(Spec) — <br /> Test Method used: Pressure vacuum Hydrostatic <br /> Other(Spect&) <br /> Test BquipmentUsed: v Equipment Resolution: <br /> UDC 0 Z UDC# UDC# UDC# <br /> ® UDC Manuthchwer: <br /> UDC Material: FZL <br /> UDC De the 'Z'V <br /> Height from UDC Bottom to Top <br /> of Hi host Pi is Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing.,__ <br /> Portion of UDC Tested br u <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both No NA Yes No NA, Yes No NA Yes No NA <br /> product and water)?0 <br /> ater ?0 <br /> Z wbine shutdown response time <br /> Is system programmed for fail- No NA Yes No NA Yes No NA Yes No NA <br /> safe shutdown? <br /> Was fail-safe verified to be &0 No NA Yes No NA Yes No NA Yes No NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> LtqLling test <br /> Test Start Time: <br /> Initial Reading 11 <br /> Test End Time: <br /> Final RandiAg Q <br /> Test Duration: L S—b^ <br /> Chane in Readin e r <br /> Pmw7ail Threshold or Criteria: -r— <br /> Test Result: ❑ Paps exit ❑ Paas ❑Fail ❑ Paw ❑Fall ❑ Pon ❑Fall <br /> Was sensor removed for testing? No NA Yes No NA Yes No NA Yes No NA <br /> Was sensor properly replaced andt— <br /> verified ftmcdonal after testae No NA Yes No NA Yes Na NA Yea No NA <br /> COMMeAts— (include biftwMation on repairs made rior to testing, and recommended ollow=u or ailed tests <br /> c <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk M is"NO"or"NA",the entire UDC must be tested. (See SWRCB LO.160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.