Laserfiche WebLink
s <br /> WRr1TEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Dcpartment,(209)468-3420. <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641(h) <br /> FACHXrY NAME la 3`tom DATE 7 1 t L40 Z <br /> FACILITY ADDRESS 2.14110 J o E ?o V- La <br /> 1.Name(s)and Title(s)of the people responsible for performing the monitoring and/or maintenance <br /> N►ISSt.ow.I r�N•C°� L/L�vt1NE x E'mt�.Gc�c`r ®tS i+igrcti� <br /> 2.Descn'be*the frequency of performing the monitoring for- <br /> TANKS <br /> orTANKS W v 064 PIPING gA a rt r,-tre%A-S <br /> 3.Descnbe the location(s)of where the monitoring will be performed. ie:location of sensors <br /> SC!jSams '- Tia.±ZW-- A+vauvtAMt.Sa ��a-`tS voC, a•eo••� a T'®� P -e+�c-L. ' .r (.�AG4L- A-eTe7+�``. <br /> 4.Describe the following equipment for each underground storage tank <br /> Name and Model of Monitoring Panel V Ke%->eA- tt-&OS: I-L S- 3 Ste► <br /> Name and Model of Line Leak Detectors IL Ems► '3 4CM-e T CrP 't <br /> Name and Model of Annular Sensors V t.. Ve-A"T '19!%4 3:5 0 44 o S <br /> Name and Model of Piping Sensors "ae'c-- 94. 110 `71`-4 3 q ® 2-0 4' <br /> Name and Model of Dispenser Sensors of �'�`X- �- "C '"t"L`'t 't® - '?-o <br /> Type of overfill prevention �°e-VL �/i4"`�C-- <br /> S.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes) No 0 <br /> Does the turbine shut down if a sensor is disconnected? Yes§0 No 0 <br /> Does the turbine shut down is the monitoring panel loses power? YesW No 0 <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> Aa. -M %it s,TviL %NkLd. or-i �• Sg fL"aye t,oL�'` i!r'® ve rc.G-o r+tiA-tri rc+J►`'at.L <br /> Mon. ? M4i4 <br /> ?.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? &yy k a e N-tEr cFr tawo oc,Enas w►c w ow t•rrn2 <br /> JrevL. PSC rj&jd. AtoN►tGe2 tS LiiYt-'r r-1 ED `N <br /> Note.For new Installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testing performed before December3l,2003. <br /> 8.Describe the training necessary for the operation of UST system,including piping,and the monitoring <br /> equipment. T24►'ty L R E P"w't® y v PO n+ W W-EA-ev O R.{-�eL e S tttYL <br /> P t-0vt p4e > k r %-CA c T A-N N v AA," <br /> LA=tcml-kWs't v=itotinSp1an doc <br /> 1/24t2002 <br />