Laserfiche WebLink
d d <br /> 3 <br /> CPT Controller Manual: Installation and Operation <br /> ARE260-240-1 Rev. A <br /> First Printing 1997 Printed in USA <br /> 9798990001 54321 <br /> Certifications and Listings <br /> The Marley Pump Company is ISO 9001 certified. Red Jacket's CPT submersible pump <br /> has been approved by Underwriters Laboratories to carry the UL Listing Mark. <br /> Trademarks <br /> The logos for Red Jacket and Marley Pump are property of The Marley Pump Company. l <br /> The UL logo is property of Underwriters Laboratories Inc. Other trademarks used in this <br /> manual include Belden and Scotch-Cast. <br /> IMMarley Pump <br /> AUMtt40ominmo Cane W <br /> © 1997, Marley Pump Company, a United Dominion company. The information in this <br /> manual is proprietary and intended only for distributors, installers, and owners of Red <br /> Jacket equipment. Any other use of this manual in part or in whole must be authorized in <br /> writing. The Marley Pump Company reserves the right to make design improvements and <br /> pricing modifications as necessary and without notice. Marley Pump is not responsible for <br /> the operation of equipment from other manufacturers when used in conjunction with Red <br /> Jacket petroleum equipment. <br /> The Marley Pump Company <br /> 9650 Alden Road <br /> Lenexa, KS 66215 USA <br /> (913) 498-5500 <br />