Laserfiche WebLink
TABLE OF CONTENTS <br /> Tableof Figures...............................................................................................................................iv <br /> AboutThis Manual............................................................................................................................v <br /> Abbreviations and Symbols.............................................................................................................vi <br /> Chapter1: Introduction...................................................................................................................1-1 <br /> Overview........................................................................................................................................1-1 <br /> Features of the Red Jacket CPT Controller...................................................................................1-1 <br /> Constant Pressure Output..........................................................................................................1-1 <br /> Line-Leak Detection...................................................................................................................1-2 <br /> Stand-alone Pump Operation.....................................................................................................1-2 <br /> TandemPump Operation...........................................................................................................1-2 <br /> Chapter 2: Red Jacket CPT Controller..........................................................................................2-1 <br /> Overview................................................................................:.......................................................2-1 <br /> CPT Controller Specifications........................................................................................................2-1 <br /> Basic Components of a CPT Controller.........................................................................................2-2 <br /> Controller....................................................................................................................................2-2 <br /> InverterBoard.........................................................................................................................2-3 <br /> CapacitorBoard......................................................................................................................2-3 <br /> ProcessorBoard.....................................................................................................................2-4 <br /> Pressure Transducer and Intrinsic Safety Barrier Kit.................................................................2-4 <br /> TechPod (Optional)...................................................................................................................2-4 <br /> Chapter3: Installation....................................................................................................•--..............3-1 <br /> Overview........................................................................................................................................3-1 <br /> InstallationDOs and DON'Ts.........................................................................................................3-1 <br /> Installation Safety Notices..............................................................................................................3-2 <br /> Installingthe CPT Controller..........................................................................................................3-3, <br /> Setting the DIP Switches for Stand-alone or Tandem Operation...............................................3-5' <br /> Running and Attaching the Input Power.....................................................................................3-6 <br /> Running and Attaching the Dispenser Input...............................................................................3-8 <br /> Running and Attaching the Output Power..................................................................................3-8 <br /> Wiringthe Contractor's Box.......................................................................................................3-9 <br /> Field-Wiring the CPT Pump with Quick-Set Feature...............................................................3-11 <br /> Installing the Intrinsic Safety Barrier and Pressure Transducer...................................................3-13 <br /> Wiring a Transducer for a Stand-alone CPT Pump in Single Conduit.....................................3-14 <br /> Wiring a Transducer for Tandem CPT Pumps........................................................................3-16 <br /> Insulating the Wiring Connections...............................................................................................3-16 <br /> Sealing Wire Connections in Insulating Resin.........................................................................3-16 <br /> Sealing Wire Connections in the Optional Connector Board and Housing..............................3-17 <br /> Programming for Stand-alone or Tandem Operation..................................................................3-18 <br /> Chapter 4: Startup, Calibration,and Operation............................................................................4-1 <br /> Overview........................................................................................................................................4-1 <br /> Setting the Pump Control Pressure...............................................................................................4-1 <br /> PurgingAir from the Line...............................................................................................................4-2 <br /> Adjusting the Functional Element..................................................................................................4-3 <br /> Calibrating the Flow Rate...............................................................................................................4-5 <br /> Verifying Line-Leak Detection........................................................................................................4-7 <br /> Apparatus to Verify Operation (AVO)for Evaluating Basic Functions.......................................4-7 <br /> Field Test Apparatus (FTA)for Finite Testing............................................................................4-7 <br /> FXTester...................................................................................................................................4-7 <br /> Testingthe Installation...................................................................................................................4-8 <br /> ARE260-240 Rev.A ♦ 6197 111 Contents, Figures,About This Manual... <br />