My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JARED <br /> CKET- <br /> CPT Controller Manual <br /> DON'T allow unauthorized field service personnel to work on the <br /> CPT. Unauthorized work adversely affects the intrinsic safety of the <br /> system and voids product warranty. <br /> DON'T run any other lines or power devices through the CPT <br /> Controller. <br /> DON'T run the CPT Controller wires through any other device. <br /> DON'T drill any holes in the CPT Controller enclosure. <br /> DON'T cross-wire the pressure transducer. <br /> DON'T use PVC conduit for pump power wiring. <br /> DOS <br /> The following list represents the DOs for installing the CPT Controller unit. Please read <br /> through this list before beginning the installation. <br /> DO plan all conduit and contractor's box installations before <br /> mounting the CPT Controller. <br /> DO install the system to meet the requirements of the National <br /> Electrical Code; federal, state, and local codes; and any applicable <br /> safety regulations. <br /> DO disconnect all power before making final connections. <br /> DO maintain intrinsic safety. Observe installation instructions for <br /> installing the intrinsic safety'barrier. <br /> DO observe proper conduit access into the CPT Controller. <br /> DO mount the CPT Controller in a dry, climate-controlled <br /> environment. <br /> DO install the earth ground wire. <br /> DO hardwire the CPT Controller to a dedicated isolated power <br /> source. <br /> DO install a station ground rod (if one is not present), and attach <br /> the CPT Controller's earth ground. <br /> Installation Safety Notices <br /> ATTENTION INSTALLER: Read this important safety information before beginning <br /> work. <br /> W This product operates in the highly combustible <br /> environment of a gasoline storage tank. To protect <br /> yourself and others from serious injury,death,or <br /> substantial property damage, carefully read and follow <br /> the warnings and instructions in this manual. <br /> Chapter 3: Installation 3-2 ARE260-240 Rev.A ♦ 6/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.