My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CPT Controller Manual 4REDJACKET <br /> Failure to follow all instructions in proper order can <br /> cause personal injury or death. Read all instructions <br /> before beginning installation. All installation work <br /> must comply the latest issue of the National Electrical <br /> Code(NFPA 70),the Automotive and Marine Service <br /> Code(NFPA 30A),and local code requirements that <br /> apply. <br /> Only trained and qualified personnel may install, <br /> program, and troubleshoot Red Jacket equipment. <br /> Hazards can cause severe personal injury, death, or <br /> substantial property damage if ignored. <br /> Always tag and lock out breakers on all circuits <br /> connected to the CPT before beginning installation or <br /> service procedures. If the electrical circuit breakers <br /> are accidentally turned on while the CPT is being <br /> serviced or installed,there is a potential for lethal <br /> electrical shock. Also,a spark could ignite any <br /> hydrocarbon vapors present,which could result in an <br /> explosion or fire. <br /> Notice,� The CPT Controller can be used only with constant <br /> pressure turbine(CPT) pumps. <br /> Notice/ Specifications and installation instructions may <br /> change if the manufacturer recommends changes. <br /> Installing the CPT Controller <br /> Before beginning the installation procedures, carefully read and understand all <br /> instructions. <br /> Voltage stored in the capacitor bank of the CPT <br /> Controller presents a risk of POTENTIALLY LETHAL <br /> ELECTRICAL SHOCK EVEN AFTER THE POWER IS <br /> DISCONNECTED. After disconnecting the power,wait <br /> about 2-5 minutes,and until the red Capacitor Charge <br /> light on the Inverter board goes out, before servicing <br /> or removing the controller. <br /> Rubber plugs for the bottom of the contractor's box <br /> are not supplied. Install the vapor seal-offs required by <br /> NEC. Use only gasoline-and oil-resistant materials <br /> between the CPT Controller and the contractor's box. <br /> Failure to comply with applicable codes and NEC <br /> requirements could result in an unsafe installation. <br /> Notice/ Before installing the CPT Controller, carefully plan all <br /> conduit runs and wire connections. The transducer <br /> cable can be run in the same conduit as the pump <br /> wires. <br /> ARE260-240 Rev.A ♦ 6/97 3-3 Chapter 3:Installation <br />
The URL can be used to link to this page
Your browser does not support the video tag.