My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%— --.. MONITORING AND RESPONSE PLAN - SC <br /> ARCO PRODUCTS COMPANY FACILITY WITH VMS <br /> DISPENSER SPILL CONTAINMENT DEVICES <br /> DATE <br /> ARCO Facility: (D341 Address: W)b ��A l-�+` Roq� <br /> This is a monitoring and response plan of action for facilities with spill <br /> containment devices installed beneath the dispensers. <br /> 1 . CONTAINMENT EQUIPMENT <br /> Dispenser spill containment devices [box(es)] are located beneath <br /> each dispenser to contain any leaks from components and fittings <br /> inside the dispenser cabinet. A mechanical sensor is located in the <br /> box. When the sensor detects the presence of a liquid, it will activate <br /> the impact valve and shut the dispenser down. <br /> 2. MAINTENANCE SCHEDULE <br /> The containment devices will be inspected according to the <br /> manufacturer's instructions by an outside contractor once during each <br /> calendar year. <br /> 3. ROUTINE MONITORING PROCEDURE <br /> On a weekly basis the facility operator shall: <br /> A. Inspect each containment box for the presence of a liquid. <br /> B. Remove debris from the containment box. <br /> If any liquid is found, manually close the impact valve, place the <br /> dispenser "out of service", and call ARCO Maintenance immediately. <br /> 4. RESPONSE PROCEDURE - CONTAINMENT BOXES f <br /> OPERATOR RESPONSIBILITIES <br /> In the event the impact valve is activated and shuts down a <br /> ,1 dispenser, station personnel immediately: <br />
The URL can be used to link to this page
Your browser does not support the video tag.