My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Contact ARCO Maintenance or its designated agent by using <br /> the telephone number previously provided__ <br /> B. Tag the dispenser "out of order" until the liquid has been <br /> removed by authorized persons. <br /> ARCO RESPONSIBILITIES <br /> Method of removing an unauthorized release from the spill <br /> containment device: <br /> A. Any unauthorized release into the containment box will be <br /> removed by ARCO in accordance with California Health and <br /> Safety Code requirements. In the event of an emergency, a <br /> pumping contractor or truck will be available immediately. In <br /> all other cases, equipment availability will be within 12 hours. <br /> B. ARCO Maintenance will be responsible for authorizing and <br /> selecting contractors for the work to be performed. <br /> 5. TRAINING <br /> All employees must be trained in the subject mentioned in Sections 3 <br /> and 4 above. Training needed for the operation of the dispenser <br /> containment devices shall -include how to inspect the equipment and <br /> to manually close 'he dispenser impact valve. <br /> CASTDSC.DOC 6194 <br />
The URL can be used to link to this page
Your browser does not support the video tag.