Laserfiche WebLink
'9. Piping (cross section diagram, including connections to tank and dispensers). <br /> �_ <br /> r <br /> (A) vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank [Section 2635 Cb) (2) (B) or (C)I, or <br /> _ Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)l, or <br /> (B) X Vapor recovery piping designed so it cannot contain Liquid phase product, or <br /> (C) N/A Suction piping (below grade piping operates at Less than atmospheric pressure) CSection 2636 (a) (3)] <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) N/A Corrodible underground piping protected against corrosion (Section 2636 (b)). FRP <br /> (E) Underground primary piping will meet all of the following requirements <br /> X Primary piping in contact with hazardous substance under normal operation conditions shall be: <br /> installed inside a secondary containment system in the form of: secondary pipe—Vault or <br /> aLined trench to be sloped to a collection sump at the low point of the piping. <br /> X Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> _X_ Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> X Automatic Line leak detectors will be installed on pressurized piping <br /> Manufacturer: i/t"F1Q(c55 Mode L: Ll�S r 7E)eL� <br /> R Annual monitoring will be conducted an the pressurized piping with secondary containment. <br /> X Annual line tightness test will not be <br /> _ g required if the continuous monitor shuts dawn the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20. State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21. _� Plan review and operating permit fees paid. <br /> 22. _� What is the approximate depth to ground water: 9.5 to 11 feet <br /> (include source of information - borehole logs, monitoring well data, water <br /> studies, etc.)Geotechnical investigation - Secor Report #40007-130-01 (Attached) <br /> 23. X Total number of tanks on site after installation: 3 �Im!� /q:T J�-I <br /> 24. X County/City Fire District and Building Department notified. <br /> 25. X In the event contamination is observed, confirmed or suspected as a result of a Leaking UST system it is your <br /> responsibility Cin accordance with (CCR), Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to PNS-EHD Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owoperra1tor s acknowledge this responsibility for workplan submittal by signature and date below. <br /> 11 <br /> Name C. - Title,¢>7-O Atclk7cSc 1f1Ti. c Date _r/-7/1-7 _ <br /> CONDITIONS OF APPROVAL: T�� <br />