Laserfiche WebLink
ID ® AUG 13 '98 15 :24 No .002 P . 11 <br /> ftTDBNQANQ <br /> _H <br /> LV.0%E-LPjRjJQfJQV_UV C I <br /> WITH <br /> ARCO Facility: (SaAln Address: IA'16 C>W'N"" '-%ft <br /> This is a monitoring and response plan of action for facilities with spill <br /> containment devicee. Installed beneath the dispensers. <br /> 1 <br /> Dispenser spill containment devices lboxies)) are located beneath <br /> each dispenser to contain any looks from components and fittings <br /> inside the dispenser cabinet. A mechanical sensor is located in the <br /> box. When the sensor detects the presence of a liquid, it will activate <br /> the impact valve and shut the dispenser down. <br /> 2. <br /> The containment devices will be inspected according to the <br /> manufacturer's-instructions by an outside contractor once during each <br /> calendar year. <br /> 3. <br /> On a weekly basis the facility operator %half: <br /> A. Inspect each containment box for the presence of a liquid. <br /> B, Remove debris from the containment box. <br /> I t any liquid is found, manually close the impact valve, place the <br /> dispenser "out of service", and call ARCO Maintenance immediately. <br /> 4. <br /> OPERATOR RESPONSIBILMES <br /> In the event the impact valve Is activated and shuts down a <br /> dispenser, station personnel Immediately: <br />