My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ID ® AUG 13 '98 15 :24 No .002 P . 11 <br /> ftTDBNQANQ <br /> _H <br /> LV.0%E-LPjRjJQfJQV_UV C I <br /> WITH <br /> ARCO Facility: (SaAln Address: IA'16 C>W'N"" '-%ft <br /> This is a monitoring and response plan of action for facilities with spill <br /> containment devicee. Installed beneath the dispensers. <br /> 1 <br /> Dispenser spill containment devices lboxies)) are located beneath <br /> each dispenser to contain any looks from components and fittings <br /> inside the dispenser cabinet. A mechanical sensor is located in the <br /> box. When the sensor detects the presence of a liquid, it will activate <br /> the impact valve and shut the dispenser down. <br /> 2. <br /> The containment devices will be inspected according to the <br /> manufacturer's-instructions by an outside contractor once during each <br /> calendar year. <br /> 3. <br /> On a weekly basis the facility operator %half: <br /> A. Inspect each containment box for the presence of a liquid. <br /> B, Remove debris from the containment box. <br /> I t any liquid is found, manually close the impact valve, place the <br /> dispenser "out of service", and call ARCO Maintenance immediately. <br /> 4. <br /> OPERATOR RESPONSIBILMES <br /> In the event the impact valve Is activated and shuts down a <br /> dispenser, station personnel Immediately: <br />
The URL can be used to link to this page
Your browser does not support the video tag.