My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Guide <br /> Part I: General The monitoring liquid may be salt brine 130%CaCI in <br /> �1.0 The tank manufacturer shall supply a continuously moni- water). <br /> tored hydrostatic head pressure leak detection system. The The probe shall detect and report a change in liquid level <br /> system shall be designed by the manufacturer to detect a <br /> leak in either the primary tank or the secondary tank in either above vel established <br /> point)or below(low-alarm point) <br /> either a wet or dry excavation. the neutral level established during the initial filling and sub- <br /> sequent maintenance of the system.The probe shall not <br /> The system shall include:a brine solution(to prevent freez- operate by inducing an electrical current into the liquid <br /> ing)delivered to the job site in the interstice of the double medium that is being monitored. <br /> wall tank a reservoir mounted on top of the tank to provide The sensing range represents a built-in allowance for pres- <br /> a liquid medium for monitoring,and an electronic monitor- sure and thermal variation. Until the liquid level exceeds the <br /> ing system to sound an audible and visual alarm when the allowable variation, the probe shall not send a signal to the <br /> liquid level of the reservoir rises or falls to predetermined monitor unit. <br /> alarm points.The system shall also include an electronic <br /> sensing probe to monitor the attached collar riser for the The probe shall be capable of being mounted in the reser- <br /> submersible pump, if so specified. voir in a manner that allows adjustment of location. The <br /> probe must be able to be mounted so that normal fluctua- <br /> tions of the liquid level do not interfere with the normal <br /> Part II:Standards operation of the probe. <br /> 2.0 The double wall tank with a brine-filled interstice shall be list- The probe shall be capable of operating at a distance of 500 <br /> ed by Underwriters Laboratories.The electronic monitoring feet from the control panel. <br /> system used to monitor the liquid reservoir and the attached 4.2 Attached Collar Riser Probe <br /> collar riser shall also be listed by U.L for intrinsic safety in a (if applicable and shown on the drawing) <br /> hazardous location. <br /> The probe shall be constructed of a material that is suitable <br /> Al equipment shall be installed in accordance with the man- for prolonged, complete immersion in any of the fluids listed <br /> ufacturer"s instructions and all applicable federal, state, and in U.L. Standard for Safety 1316, Table 14.1, all columns. <br /> local laws and regulations. <br /> The probe shall detect the presence of liquid in the riser <br /> when the liquid level has risen to a maximum of one inch <br /> Part III: Requirements for above the bottom of the probe,as located in its permanent <br /> mounting position.The permanent mounting position is <br /> Liquid-Filled Double Wall Tank determined by the installer at the time of installation <br /> 3.0 The interstice of the double wall tank shall be filled with a The probe shall be capable of being mounted in the riser in <br /> brine solution.Tanks up through 20,000 gallons shall be a manner that allows adjustment of location. The probe <br /> • delivered to the site with the brine solution in the interstice. shall be able to be mounted so that an increase in the liquid <br /> Brine filling of interstice on 25,000 and 30,000 gallon tanks level does not interfere with the normal operation of the <br /> shall be done at job site by contractor.The reservoir shall be probe. <br /> constructed of fiberglass and mounted directly to the top of The probe-mounting assembly supplied and installed by <br /> the tank.The reservoir shall be fitted with one 4"NPT fitting contractors shall provide protection for the probe from the <br /> for installation of the electronic-reservoir probe. operational activities that may take place within the riser. <br /> The probe shall be capable of operating at a distance of 500 <br /> Part IV: Requirement for the feet from the control panel. <br /> Electronic Monitoring System 4.3 operating Parameters: <br /> 4.0 The Controller Temperature: 0°F to 150°F <br /> The panel shall receive the signal from the reservoir and/or Voltage: 1 10 or 220 VAC, 50/60 Hz <br /> attached collar riser and provide for the following indications: <br /> I. System normal Part V: Performance <br /> 2. System fault(The-fault-indication must not be the same 5.0 The continuous hydrostatic-monitoring system, including the <br /> as the"alarm"indication.) electronics and the probes, shall be capable of detecting <br /> 3. System leak alarm and alarming when the liquid level in the tank reservoir rises <br /> Also, a system test switch indicating the system is functional or drops beyond the allowable variation. <br /> shall be provided. <br /> All alarms shall be both audible and visible. Part VI: Materials <br /> The unit shall be able to be reset. 6.0 The materials used in the monitoring system shall be <br /> The control panel shall provide indication of which tank is in corrosion resistant to the liquid used to fill the interstice <br /> the alarm condition, if more than one tank is being moni- <br /> tored. <br /> The control panel shall be capable of monitoring up to eight Part VII: Installation <br /> probe points. 7.0 The monitoring systems shall be installed in accordance with <br /> The system shall provide intrinsic safety at the probe locations: the manufacturers installation instructions, and all applicable <br /> 4.1 Reservoir Probe federal, state, and local laws and regulations. <br /> • The probe shall be constructed of a material which is suitable <br /> for prolonged, complete immersion in the monitoring liquid. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.