My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f ^ <br /> uimom. t e <br /> C. Optional Fill Tubes 3.Sizes Standard Other Sizes <br /> 1.Fill tubes shall be FRP or contractor supplied and Fill 4" <br /> installed aluminum. Locations are shown on <br /> drawings. Gauge 4" <br /> Inlet 4" <br /> 2.FRP tubes shall be 4"diameter,with a 6"x 4" <br /> double-tapped reducer bushing, and include a 6" Outlet 4" <br /> NPT fitting on the tank. FRP tubes can be installed Vent 4" <br /> in manway cover or tank shell wall.Aluminum <br /> tubes(contractor supplied)shall be 4"in diameter Extra 4" <br /> and fit directly into a 4"NPT fitting.Tubes shall ter- 4.Strength-NPT fittings shall withstand a minimum <br /> minate a minimum of 4"from the bottom of tank. i of 150 foot-pounds of torque and 1,000 foot- <br /> D. Gauge Plates--Gauge plates shall be installed under pounds of bending, both with a 2:1 safety factor. <br /> each service fitting and manway opening. H. Monitor fittings-Each monitor fitting shall consist of a <br /> E. Heating Coils 4'NPT fitting on the secondary tank. <br /> 1.Optional heating coils shall be installed in a <br /> separate 22"manway and shall be the standard Part IIkEX@cuti0n <br /> item supplied by tank manufacturer. ; 3.01 Installation <br /> 2.Location is shown in Dimensional Data on pages Contractor shall be trained b <br /> 7-9. Y the tank manufacturer, <br /> F. Optional Ladders-Ladders shall be the standard - the state or other approved agency. <br /> ladder as supplied by tank manufacturer(aluminum, 3.02 Testing <br /> carbon steel or fiberglass). Tanks shall be installed and tested according to current <br /> G. NPT Threaded Fittings double wall installation instructions provided with the <br /> tank. (Refer to current publication and include as part of <br /> I.Al threaded fittings shall be a material of construc- specification.) <br /> tion consistent with the requirements of the U.L. <br /> label. <br /> 2.Al standard threaded fittings shall be half couplings Part IV:Warranty <br /> and shall be 4"in diameter.Reducers are to be used 4.01 Warranty shall be manufacturer's current <br /> for smaller sizes where shown and provided by standard warranty. <br /> contractor. <br /> Warranly <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.