My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t;1 INTRODUCTION <br />C <br />This report presents the results of a preliminary geotechnical investigation performed at the request <br />of ARCO Products Company by SECOR International Incorporated (SECOR) for the site of a <br />proposed ARCO gas station and AM/PM facility #YWNE located at 2470 West Grant Line Road <br />in Tracy, California (Figure 1). <br />This report has been prepared for ARCO Products Company (ARCO) and their project design <br />consultants, to be used solely in the development of design of the proposed project as described <br />herein. Thit report may not contain sufficient information for other uses or the purposes of other <br />parties. <br />The objective of this investigation was to assess the nature and engineering properties of the <br />encountered subsoils and to provide tentative geotechnical design recommendations for site <br />development. A "Site Acquisition Environmental Assessment" was performed concurrently with <br />this investigation and is presented under separate cover. <br />The scope of work was performed in accordance with the instructions received from ARCO, and <br />included the following tasks: <br />• Drill, log and sample seven soil borings and convert four borings to temporary <br />groundwater monitoring wells; <br />• Perform laboratory soil testing on selected soil samples; <br />• Evaluate geotechnical properties of soils pertinent to the design and construction of the <br />proposed development; and <br />• Summarize findings, conclusions, and recommendations in a report. <br />The site of the proposed ARCO facility is located on the northerly side of Grant Line Road, <br />easterly of the proposed Pembo Road and southeasterly of the Interstate 205 freeway. Currently, <br />the site is bounded by vacant property on the north east and westerly sides. An existing Shell gas <br />station is located approximately 50 feet westerly of the site across the proposed right-of-way for <br />JN4O o7-095-01 <br />u�4nsx�97-o6�m�saeygeo.doc <br />1-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.