My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 SUBSURFACE INVESTIGATION <br />3.1 SOIL i 1 <br />The borings were drilled using an 8 -inch outer diameter, hollow -stem auger to depths between 20.5 <br />and 50.5 feet below existing ground surface, at the locations shown on Figure 3. The rationale for <br />placement of the borings was to locate at least one boring in the vicinity of each of the proposed <br />structures with additional borings located for addressing environmental concerns. <br />A SECOR staff engineer was onsite to observe field operations, log subsurface soil conditions, and <br />to collect soil samples for physical and chemical analysis. Drive samples were obtained from the <br />borings by driving a 2.5 -inch inside diameter split -spoon sampler or 1.4 -inch inside diameter Stand <br />and Penetrometer (SPT) sampler with a 140 -pound hammer, free -falling 30 inches. The sampler <br />was advanced 18 inches at each sample interval and the blow counts required to advance the <br />sampler each 6 -inch drive length were recorded on the boring logs. The blow counts are used in <br />the evaluation of the consistency of the soils and are correlated to various engineering properties. <br />The boring cavities were backfilled with a neat cement grout. Generalized logs of the interpreted <br />soil profile at each boring location based upon observations of auger cuttings and material retained <br />in the samples are presented in Appendix A. <br />At the request of ARCO, borings MW -1, MW -2, MW -3 and MW -4 were converted to <br />groundwater monitoring wells. The wells were constructed by inserting the two-inch diameter <br />Schedule 40 PVC casing through the annulus of the auger and then tremming the filter sand <br />(Monterey, #2/12) through the auger annulus while slowly retracting the auger. The filter sand was <br />placed to approximately 2 feet above the top of the 0.01 -inch slotted screen, at which point the well <br />was sealed with hydrated bentonite chips. Each well was protected with a cap and a traffic -rated <br />well cover box. The wells were screened in the interval of approximately 7 to 22 feet bgs. The <br />boring logs, including well construction details, are presented in Appendix A. <br />The following laboratory tests were performed on samples collected at the subject site by Converse <br />Consultants, Redlands, California, in accordance with the American Society for Testing and <br />Materials, or contemporary practices of the soil engineering profession. <br />Direct Shear Test (ASTM D3080): The shear test was performed using a direct shear machine <br />on an undisturbed sample. The sample was sheared in a single horizontal configuration at a <br />constant strain rate. Normal loads were applied vertically, and the ultimate soil shear strength <br />was determined at this load. Normal load was varied in order to evaluate the internal friction <br />angle and cohesion. The sample was tested at near saturated moisture condition. <br />JN 40007-095-01 <br />ft\rnsw\97-06jun\atr *0.doc <br />3-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.