Laserfiche WebLink
9 0 <br /> PLLD Site Prep and Installation Guide PLLD Controller Module <br /> PUMP POWER WIRING TO PLLD CONTROLLER MODULE <br /> 1. Switch Off,tag, and lockout all AC power to the console,dispensers and submersible pumps. <br /> 2. Run conduit(s)from the Power bay of console to the main power panel (Figure 3-2).The conduit must be large <br /> enough to tit two#14 AWG wires for each pump which has an installed PLLD transducer.There are knockouts for <br /> 3/4-inch, I-inch or 11/4-inch conduit in the console.When deciding on the size and number of conduits required, <br /> consider the number of wires entering the console. <br /> 3. Mark and pull two#14 AWG wires(one black and one white)from the main power panel through this conduit(s)for <br /> each pump in which you will install a PLLD transducer. <br /> Am gg <br /> PI Pr� PIPI PRIG PI PRI—LI P1 R@LAYRATINGS <br /> FORM A CONTACTS. <br /> 120 vac <br /> xl1 vK+'X�J„'ks vJ Wl �fJ Vf'(J%I V.J Wi'Yll j 2A MM <br /> PRESSURE LINE LEAK CONTROLLER MODULE - <br /> �I <br /> Pull a marked pair of p <br /> 14 AWG wires from Pull a marked air of 14 AWG <br /> the main power panel�, ! wires from each pump control <br /> for each pump that has a box for each pump which has a <br /> PLLD transducer installed (- <br /> PLLD transducer Installed <br /> TO PUMP CONTROLS <br /> See <br /> "Pump Control Wiring” <br /> for specific, <br /> wiring connections <br /> Figure 3-2. PLLD Transducer-to-Controller Module Wiring <br /> 3-4 <br />