My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 0 <br /> PLLD Site Prep and Installation Guide PLLD Controller Module <br /> PUMP POWER WIRING TO PLLD CONTROLLER MODULE <br /> 1. Switch Off,tag, and lockout all AC power to the console,dispensers and submersible pumps. <br /> 2. Run conduit(s)from the Power bay of console to the main power panel (Figure 3-2).The conduit must be large <br /> enough to tit two#14 AWG wires for each pump which has an installed PLLD transducer.There are knockouts for <br /> 3/4-inch, I-inch or 11/4-inch conduit in the console.When deciding on the size and number of conduits required, <br /> consider the number of wires entering the console. <br /> 3. Mark and pull two#14 AWG wires(one black and one white)from the main power panel through this conduit(s)for <br /> each pump in which you will install a PLLD transducer. <br /> Am gg <br /> PI Pr� PIPI PRIG PI PRI—LI P1 R@LAYRATINGS <br /> FORM A CONTACTS. <br /> 120 vac <br /> xl1 vK+'X�J„'ks vJ Wl �fJ Vf'(J%I V.J Wi'Yll j 2A MM <br /> PRESSURE LINE LEAK CONTROLLER MODULE - <br /> �I <br /> Pull a marked pair of p <br /> 14 AWG wires from Pull a marked air of 14 AWG <br /> the main power panel�, ! wires from each pump control <br /> for each pump that has a box for each pump which has a <br /> PLLD transducer installed (- <br /> PLLD transducer Installed <br /> TO PUMP CONTROLS <br /> See <br /> "Pump Control Wiring” <br /> for specific, <br /> wiring connections <br /> Figure 3-2. PLLD Transducer-to-Controller Module Wiring <br /> 3-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.