My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> PLLD Site Prep and Installation Guide Transducer Installation-2 <br /> Transducer Installation - <br /> This installation procedure is to be used with Red Jacket Maxxum Big-Flo Pumps. <br /> 1. Remove the cap from the 2-inch Transducer port next to the 3-inch discharge port.Thread the PLLD transducer into <br /> the Transducer port(see Figure 4-3). <br /> IMPORTANT! Seal any pipe threads using a UL-classified,nontoxic pipe sealant suitable for the fuel involved. <br /> 2. Verify that the console has Version x19 or later software. <br /> Junction box Sea!-off, epoxy seal per NFPA spec <br /> (customer supplied) (customer supplied) <br /> j PLLD transducer <br /> in 2"Transducer m <br /> port <br /> ®U conduit to console <br /> o (customer supplied) <br /> II <br /> o <br /> i <br /> plld\maxxum.eps <br /> i <br /> Figure 4-3. Example PLLD Installation in a Red Jacket Maxxum Big-Flo <br /> Modifying Pumps to Disable Functional Elements and Relief Valves <br /> If you are using a FE Petro pump,a Red Jacket pump with a Pressurstat adjustable valve,or a Red Jacket Quantum pump <br /> with SpikeCheck valve skip this section. <br /> RED JACKET PUMPS (Excluding Quantum w/SpikeCheck Valve,and Maxxum Big-Flo) <br /> The PLLD SwiftCheck valve eliminates the need for the pump's functional element relief valve. You must modify the <br /> functional element as part of the PLLD system installation on Red Jacket pumps. <br /> 1. Remove the six 1/4-28 slot-head screws from the functional element[Figure 4-4]. <br /> 2. Remove the functional element's spring and piston and diaphragm. <br /> 3. Carefully reassemble the functional element using a new diaphragm suitable for the fuel involved. Be sure that all <br /> mating surfaces are free from debris when reinstalling. <br /> 4. Torque the six slot-head screws to 40-65 in-lbs. <br /> 4-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.