My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> PLLD Site Prep and Installation Guide Modifying Pumps to Disable Functional Elements and.Relief Valves <br /> 7e E� Failure to properly reseal the functional element may result in product <br /> leakage,which could create serious environmental and safety hazards. <br /> Fire,explosion,or ground contamination could occur. <br /> Carefully reassemble and reseal the functional element,following the <br /> procedures described in this manual. <br /> c <br /> � I <br /> Remove <br /> spring& ° <br /> piston <br /> Replace gasket <br /> Functional element u <br /> orifice-drill out to <br /> 3/16"diameter <br /> Figure 4-4. Modifying the Functional Element in Red Jacket Pumps <br /> TOKHEIM PUMPS (MODELS 585-13, 585-349 AND 585-150) <br /> The PLLD SwiftCheck valve eliminates the need for the pump's relief valve.You must remove it as part of the PLLD <br /> system installation on Tokheim pumps. <br /> 1. Remove the two bolts which secure the Syphon housing assembly to the pump [Figure 4-5]. <br /> 2. Turn the Syphon housing assembly over.Remove and discard the Relief Valve. <br /> 3. Replace the gasket and two 0-rings as noted in the figure. <br /> 4. Replace Syphon housing assembly and tighten the retaining bolts securely. <br /> f � . <br /> Failure to properly reseal the Siphon Housing assembly may result in product <br /> leakage,which could create serious environmental and safety hazards. <br /> Fire,explosion,or ground contamination could occur. <br /> Carefully reassemble and reseal the Siphon Housing assembly,following the <br /> procedures described in this manual. <br /> 4-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.