Laserfiche WebLink
9 0 <br /> PLLD Site Prep and Installation Guide PLLD Installation in FE Petro Pumps <br /> Dip Switch SW2 <br /> Pole 1 on dip switch SW2(Figure 4-9)controls the pump start up time. Set this switch to OFF so that the submersible <br /> pump will run at 34 psi for 6 seconds each time it is started.Pole 2 does not affect PLLD operation;it sets the product <br /> type for the IST-VFC(Table 4-1). <br /> Table 4-1:Dip Switch(SW2)Settings <br /> Pole 1 Pole 2 <br /> ON-gasoline <br /> OFF OFF-diesel <br /> Rotary Switch <br /> The rotary switch(Figure 4-9)controls the pump pressure of the submersible pump.As shown in Table 4-2,use positions <br /> 1,2,3,or 4 to run the pump at a pressure range compatible with PLLD operation.Do not use positions 0,5,6, 7, 8,or 9. <br /> Dip switch <br /> E 67p <br /> il, <br /> ou <br /> 4 1 / <br /> Rotary switch <br /> I <br /> i <br /> Figure 4-9. Dip Switch SW2 and Rotary Switch locations in the FE-Petro IST VFC unit <br /> Table 4-2.-Rotary Switch Positions <br /> Position Pressure(psi) <br /> 1 26 <br /> 2 28 <br /> 3 30 <br /> 4 32 <br /> 1ST VFC Software Version 1.3 <br /> The settings for Software Version 1.3 are the same as Versions LI and 1.2,except that the Rotary Switch can be set to <br /> any position from I to 9. <br /> 4-8 <br />