My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLLD Site Prep and Installation Guide PLLD Installation in Red Jacket Quantum Pumps with SpikeCheck Valve <br /> PLLD Installation in Red Jacket Quantum Pumps with SpikeCheck Valve <br /> The PLLD transducer mounts directly into the mechanical line leak detector pump port.It eliminates the need to break <br /> product lines for installation and service. <br /> Since the PLLD transducer replaces the existing mechanical device,it is suitable in applications where there is no sump. <br /> 1. Do one of the following: <br /> a. If the submersible turbine pump is equipped with a mechanical LLD,remove the mechanical unit and any related <br /> tubing and fittings,or <br /> b. If the submersible turbine pump is not equipped with a mechanical LLD,remove the 2-inch mechanical LLD port <br /> plug. <br /> 2. Thread the PLLD transducer directly into the mechanical LLD port on the pump(see Figure 4-10). <br /> IMPORTANT! Seal any pipe threads using a UL-classified,nontoxic pipe sealant suitable for the fuel involved. <br /> 3. Feed the PLLD transducer cable through the watertight cord grip on the PLLD transducer junction box.Tighten the <br /> nut on the cord grip to ensure a watertight seal. <br /> �70ftvq antunper.ePs i <br /> I <br /> . ✓ `� _, PLLD <br /> 'I = transducer <br /> f t! E <br /> SpikeCheck Valve Assy. <br /> Figure 4-10. PLLD Installation in Red Jacket Quantum Pumps(w/SpikeCheck Valve Assy) <br /> Manifolded Product Line PLLD Installation <br /> Version 9/109 or later software provides a feature that permits the use of PLLD on product lines supplied by: (1)two <br /> submersible pumps in a single tank or(2)two tanks with two submersible pumps,up to a combined maximum of eight <br /> tanks and pumps.Please refer to the System Setup Manual (Manual No.576013-623)for detailed instructions on <br /> selecting this option.For additional parts you need when installing a manifolded PLLD system,see"Before You Begin' <br /> on page 1-2. <br /> DUAL PUMPS IN SINGLE TANK <br /> Follow these guidelines as you install a manifolded PLLD system with dual pumps in a single tank: <br /> • Dielectric unions and flexible piping elements should be used as required by federal,state,and local requirements for <br /> the specific piping application.Location of unions may vary with configuration. <br /> • An interlock relay must be installed so that the slave pump is energized only when dispensing(but is switched Off <br /> when performing line tests). <br /> • A Non-Vented SwiftCheck valve must be installed in the slave pump. <br /> 4-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.