Laserfiche WebLink
0 0 <br /> PLLD Site Prep and Installation Guide Manifolded Product Line PLLD Installation <br /> 3. Wire the system as shown in Figure 5-8 on page 5-8.Follow the procedure described in"PLLD Controller Module <br /> Wiring"on page 5-3. <br /> To Dispensers Tank <br /> Plltl\mitlsing.eps <br /> T t <br /> I <br /> Flexible Pipe with Swivel or Union <br /> Flexible Pipe with <br /> Swivel or Union <br /> Ball Valve Ball Valve <br /> 1 <br /> SwiftCheck <br /> 1 <br /> Valve i <br /> PLLD Sensor <br /> Warning Tag \ Non-Vented <br /> SwiftCheck <br /> Valve <br /> i <br /> Master Pump Slave Pump <br /> Figure 4-11. Manifolded Product Lines PLLD Installation Example-Dual Red Jacket Pumps,Single Tank <br /> I <br /> To Dispensers <br /> Flexible Pipe with Swivel or Union <br /> I <br /> \ Flexible Pipe with <br /> Swivel or Union <br /> Ball Valve <br /> Ball Valve % <br /> SwiftCheck / <br /> Valve <br /> r • t <br /> PLLD Sensor <br /> Warning Tag \ Non-Vented <br /> -SwiftCheck <br /> Valve <br /> � lam I <br /> E ❑t� <br /> plldlmfdtanks.eps <br /> Master Pump Slave Pump <br /> Lower Numbered Tank Higher Numbered Tank <br /> I <br /> Figure 4-12. Manifolded Product Lines PLLD Installation Example-Multiple Tanks with Red Jacket Pumps <br /> 4-11 <br />