My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> PLLD Site Prep and Installation Guide Manifolded Product Line PLLD Installation <br /> PLLD System Installation Procedure <br /> rA Product spillage could create serious environmental and safety hazards. <br /> Fire,explosion,or ground contamination could occur. <br /> 1. If the SwiftCheck Valve is being installed at an existing site,drain the <br /> product pipeline using approved containers and procedures that will <br /> prevent product spillage. <br /> 2. Dispose of drained fuel properly.Use an approved container suitable for <br /> moving fuel.Dispose of fuel soaked materials properly and not into trash <br /> barrels that may be used by customers. <br /> 1. Turn off,tag,and lockout AC power to the submersible pumps and console before beginning the installation. <br /> 2. If the system is equipped with an in-line shutoff valve,close the valve to reduce the amount of drainage from the <br /> product lines.Collect drained fuel in an approved container. <br /> 3. Install the Non-Vented SwiftCheck valves in the slave pump's mechanical LLD pump port. <br /> 4. Install the PLLD transducer and SwiftCheck valve2 in the master pump [see Figure 4-11 on page 4-111. <br /> IMPORTANT! Sea] any NPT threads using a UL-classified,nontoxic pipe sealant suitable for the fuel involved. <br /> 5. Wire the system as shown in Figure 5-7,Figure 5-8,Figure 5-10,or Figure 5-11 as applicable.Follow the procedure <br /> described in"PLLD Controller Module Wiring"on page 5-3. <br /> MULTIPLE TANKS <br /> Follow these guidelines as you install a PLLD system into multiple manifolded tanks: <br /> • Dielectric unions and flexible piping elements should be used as required by federal,state,and local requirements for <br /> the specific piping application.Location of unions may vary with configuration. <br /> • A relay must be available on either a Four Relay Module or I/O Combination Module to control the pump on the <br /> higher-ntunbered tank.The PLLD Module will provide pump control output for the primary tank and the"Pump In" <br /> (Dispenser ON)signal for the set. <br /> • A Non-Vented SwiftCheck valve must be installed in the slave pump(s),. <br /> • Remove any other check valve or leak detect device in the line that is not shown. <br /> PLLD System Installation Procedure <br /> 1. Install the Non-Vented SwiftCheck valve3 in the mechanical LLD port of the slave pump(higher numbered tank). <br /> IMPORTANT! Sea]any NPT threads using a UL-classified,nontoxic pipe sealant suitable for the fuel involved. <br /> 2. Install the PLLD transducer and SwiftCheck valve4 in the master pump(lower numbered tank)as shown in Figure 4- <br /> 12 on page 4-11. If you are installing more than two tanks and pumps,connect the additional tanks and pumps the <br /> same way that you installed the higher numbered tank and slave pump. <br /> 1. For Maxxum Big-Flo,set the Pressurstat on the the slave STP to 20-25 psi. <br /> 2. Not required for FE Petro pumps(see Figure 4-8 on page 4-7),or Red Jacket Quantum or Maxxum Big-Flo pumps(see <br /> Figure 4-10 on page 4-9). <br /> 3. For Maxxum Big-Flo,and systems performing 3 gph only testing,set the Pressurstat on the the slave STP to 20-25 psi. <br /> 4. Not required for FE Petro pumps(see Figure 4-8 on page 4-7),or Red Jacket Quantum or Maxxum Big-Flo pumps(see <br /> Figure 4-10 on page 4-9). <br /> 4-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.