Laserfiche WebLink
PLLD Site Prep and Installation Guide PLLD Controller Module Wiring <br /> �I��—�� �. From probe, <br /> \, sensor,or <br /> J 7 transducer To console <br /> Make sure that <br /> the ends of cable <br /> \1 i sheathing are subs <br /> merged in sealant <br /> f Tie wrap <br /> ,---Wire nuts <br /> -uf> <br /> Instructions: <br /> NOTE: When temperature is below 50T (10°C), 4. Mix thoroughly to a uniform color by squeezing <br /> keep resin in a warm place prior to mixing(e.g., contents back and forth 25-30 times. <br /> in an inside pocket next to body). 5.Squeeze mixed,warm resin into one end of bag <br /> 1. Open epoxy sealant package,and remove resin and cutoff other end. <br /> pak. 6. Slowly insert wiring connections into sealing <br /> 2.Holding resin pak as shown in A,bend pak along pack until they fit snugly against the opposite <br /> long length. end as shown in C. <br /> 3.As shown in B,firmly squeeze the RED SIDE of 7.Twist open end of bag and use tie wrap to close <br /> the resin, forcing it through the center seal and it off and position the tie wrapped end up until <br /> into BLACK SIDE. the resin jells. <br /> probes„epxy2w.eps <br /> Figure 5-1. Epoxy Sealant Connections <br /> IMPORTANT! Do not put more than two wire nut connections in one epoxy sealant bag or the connections will not be <br /> properly sealed. Improper sealing of the connections will result in inaccurate system readings and possibly false alarms. <br /> PLLD Controller Module Wiring <br /> PLLD pump control wiring varies depending on the pump manufacturer's relay control box.Refer to the appropriate <br /> wiring diagram (circuit diagrams are for switched"hot”dispensers): <br /> • Red Jacket--Figure 5-2 on page 5-4 through Figure 5-5 on page 5-5 <br /> • Non-Red Jacket--Figure 5-6 on page 5-6 <br /> • Manifolded--Figure 5-7 on page 5-7 or Figure 5-8 on page 5-8 <br /> • Gilbarco Dispenser Isolation Box--Figure 5-9 on page 5-9 <br /> IMPORTANT! Dispensers and console must be wired to the same leg of incoming power at the main electrical panel; <br /> otherwise damage may result to both. <br /> The console must be able to detect when dispensers are switched On or Off so it only initiates line leak tests when the <br /> dispenser is switched Off. The console must also be able to start the submersible pump to perform a line leak test,and <br /> shut off the pump if a leak is detected. <br /> IMPORTANT! The console,when wired correctly,will control the pump independent of the dispenser control circuits.It <br /> is imperative that when the Emergency Stop switch is wired and tested the console's pump control circuitry CANNOT <br /> switch On the pump.To ensure that the pumps are unable to be activated in an emergency situation,it is best to have the <br /> Emergency Stop switch interrupt pump power at the circuit breaker panel via shunt breakers. <br /> Note: (OPTIONAL)In order to prevent 3.0 gph tests from running when STP power is switched Off,an Interlock relay <br /> may be used on the PUMP IN signal(ref.Figure 5-3 and Figure 5-7). <br /> • <br /> 5-3 <br />