My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLLD Site Prep and Installation Guide Checking the Site's Emergency Stop Switch <br /> Press the STEP key to view the pump status.Because a passing line test has not been run,the line status will be disabled <br /> and you should se the message: <br /> ®X: Product Label <br /> DISPENSING DISABLED <br /> y <br /> In the display shown,Q=device code for PLLD,X=line number,Product Label=name assigned to product in tank <br /> setup,and Dispensing Disabled=current line status. <br /> Press ENTER to run a 3.0 gph line test.During the"Running Pump"state,verify that the Pump On pressure is within the <br /> range 22-60 psi then drops to within the range 18-26 psi during the"Test 3.0"and"Test Complete"states: <br /> O XX.XXX PSI PUMP OFF <br /> TEST COMPLETE HANDLE OFF <br /> If there is not at least a 2 psi difference between the Pump On pressure and the Pump Off pressure, a no-venting <br /> condition exists that will interfere with precision line testing.Please consult the PLLD Alarm Quick Help guide's <br /> "Periodic or Annual Test Needed Warning"discussion for troubleshooting information. <br /> Check for STP leaks as follows: <br /> a. Turn On the STP and carefully check all fittings and the functional element for leaks. <br /> b. Verify that the functional element, strainer,and check valve threads into the pump are not leaking. <br /> �& WARNING! The PLLD does not perform any leak test on the functional element or any other <br /> components upstream from the check valve and will not detect leaks there. <br /> c. Tighten any leaking fittings until the leak is stopped.Be careful not to overtighten and strip the threads. <br /> d. If the leak cannot be stopped,turn Off,tag,and lock out power to the submersible and check the fitting for thread <br /> damage or improper sealing.Replace or reseal the fitting as required. <br /> Checking the Site's Emergency Stop Switch <br /> After the PLLD system is installed and all lines are enabled for dispensing,test the site to ensure that the Emergency <br /> Stop switch will shut down the pumps for all lines. <br /> 1. Turn On power to the Console. <br /> 2. Engage the Emergency Stop switch. Dispensing from all lines should stop immediately.If the pumps do not stop, <br /> rewire the Emergency Stop switch circuit. <br /> r <br /> 6-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.