Laserfiche WebLink
Installation Guide Example VSFG Installations <br /> EXAMPLE INSTALLATIONS <br /> Red Jacket STP <br /> VSFC unit Connections <br /> -------- Class 1, Div. 1, Group D <br /> The Red Jacket <br /> Line Pressure Epoxy-scaled connections inside <br /> waterproof junction box <br /> Veeder-Root Transduc <br /> in leak detector port <br /> (P/N 848480-001) <br /> Line Pressure <br /> AC in Pump Control <br /> Pump Control ..... ...... <br /> 4" Standard <br /> WARNING! I Epoxy-sealed connections <br /> Line Hook Line pressure wiring I <br /> I Line Pressure inside waterproof <br /> Pressure Signal is an intrinsically safe I junction box <br /> circuit and must be 11 <br /> wired accordingly. <br /> Line <br /> Pressure <br /> Veeder-Root Transduc <br /> TLS-350 v and SwiftCheck valveV. <br /> in leak detector port <br /> (P/N 84,4813-00.)rt <br /> Pump Control <br /> 4" Quantum <br /> Epoxy-sealed <br /> connections inside <br /> separate I Line Pressure F waterproof <br /> conduit>r junction box <br /> (typical) Hook Signal r <br /> Veeder-Root <br /> Transducer in leak <br /> Red Jacket detector port <br /> SpikeCheck valve (P/N 848480-001) <br /> valve <br /> 1 Pump Control <br /> P1 <br /> _Jnk.Avf­14.�p� <br /> Figure 3. SF /TLS-3 installation examples with separate conduits for pressure and pump control signals <br /> 7 <br />