My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Guide VSFC Unit Dimensions <br /> DimensionsVSFC • PC Boards <br /> VSFC Unit Dimensions <br /> Figure 4 shows dimensions and mounting hole pattern of the VSFC unit. Note the clearance around the unit <br /> that is required for air circulation. <br /> INSTALLATION TIP!Cut out mounting hole template from Appendix C.Tape template in position <br /> on wall and drill all six holes for fasteners. Remove template and screw in the bottom two <br /> fasteners, leaving about 3/811 of thread showing. Position unit so bottom mounting slots rest on <br /> the first two screws.Screw in remaining four screws and then tighten bottom two screws. <br /> ----------------------------------------------- <br /> I <br /> I <br /> 7" _ Top 0.281"Hole(4) <br /> 1 <br /> 7nvarlbbl�eS;p;e�ad <br /> 4.25' <br /> Side <br /> jClearance i 4.25" <br /> i� <br /> 6.25" <br /> 6" 0.281"Slot(2) <br /> Top&Bottom <br /> Clearance Back View <br /> 1/2"Conduit Cord grips(2) <br /> (I.S.Inputs/Outputs) (RS-485) <br /> 1/2"Conduit entry <br /> (Non-I.S.input) <br /> 1/2"Conduit entry <br /> ® ® ® (Hook input) <br /> ODOO <br /> 3/4"/1"conduit <br /> ' (Power out) <br /> 6-3/4" <br /> 4 3/4" 3/4"conduit <br /> (Power in) <br /> r.djacWMr c\figs eps <br /> Bottom View <br /> Figure 4.VSFC mounting holes and unit dimensions <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.