Laserfiche WebLink
Page Aof 7 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Wayne Perry Inc. Equipment Resolution: .0007" <br /> Sump# �'( Sump# 2, Sump# ' Sump# <br /> Sump Diameter: q) q) q a' >' <br /> Sump Depth: <br /> Sump Material: F)eg6vo S Fi"-"JA S- <br /> Height from Tank Top to Top of 6ay » >, <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest S Lt » <br /> Electrical Penetration: ' 1 <br /> Condition of sump prior to testing: UOINGL <br /> Portion of Sum Tested 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST <br /> Sump PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> product and water)?* <br /> Turbine shutdown response time NA NA NA <br /> Is system programmed for fail-safe ❑Yes El ®NA E]Yes [INo ®NA E]Yes El ®NA El [INo ®NA <br /> shutdown?` <br /> Was fail-safe verified to be ❑Yes ❑No ®NA ❑Yes []No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> test: <br /> Test Start Time: :53 Cjj J <br /> Initial Reading(RO: 2.373 I.9 Z OZ. Z•g550 <br /> Test End Time: (0: 0$ 0(}.0 110,OX. <br /> Final Reading(RF): •2J I�2 0•.�L03 14�63 <br /> Test Duration: 15 Min 1 Min 15 Min 1 Min 15 Min Min 15 Min 15 Min <br /> Change in Reading(RF-RD: rWOZ6 .00011 n07 <br /> Pass/Fail Threshold or Criteria: -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 '0.0020 -0.0020 40020 <br /> Was sensor removed for testing? Yes ❑No ❑NA ❑Yes ❑No ❑NA aYes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and fAYes [INo ElNA ElYes [INo ElNA 9(Yes [INo [INA ElYes ElNo ElNA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> BP Arco # 6347 <br /> 2430 Joe Pombo Pkwy <br /> Tracy, Ca 95377 <br /> SB 989 Testing <br />