My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of <br /> 8. RL RISER CONTAINMENT SUMP TE NG <br /> Facility is Not Equipped With Fill Riser Containment Sums ❑ <br /> Y Fill Riser Containment Sumps are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Sump Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑ Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Wayne Perry Inc. See Attached Results Equipment Resolution: .0007" <br /> Sump# Sump# k7 Z Sump# Y:L Sump# <br /> Sump Diameter: 3 9 36 s " <br /> Sump Depth: " 52, " 52 <br /> Sump Material: f VhLNf <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: �9 <br /> Height from Tank Top to Lowest „ <br /> Electrical Penetration: t 1 <br /> Condition of sump prior to testing: CMAN <br /> Portion of Sump Tested' 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST <br /> PENETRATION PENETRATION PENETRATION PENETRATION <br /> Wait time between applying water 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> and starting test: <br /> Test Start Time: 9. <br /> Initial Reading(Rj): 2. H 2 (®I 2. 919 <br /> Test End Time: 33 <br /> Final Reading(RF): 2.9495 2.5D&5 2 •11"1 2 <br /> Test Duration: 15 Min 1 Min 15 Min 15 in 15 Min 15 in 15 Min 15 Min <br /> Change in Reading(RF-RD: ,00001 .0001 ,Owz <br /> Pass/Fail Threshold or Criteria: -0.0020 -0.0020 -0.0020 0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> F _ MW <br /> Is there a sensor in the sump? Yes ❑No ❑NA19 <br /> Yes ❑No ElNA Yes ❑No ❑NA [IYes ❑No ElNA <br /> Does sensor alarm when either Yes ❑No ❑NA [ 'Yes ❑No ❑NA [A Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product or water is detected? <br /> Was sensor removed for Testing? Yes ❑No ❑NA Yes ❑No ❑NA [A Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and Yes ❑No ❑NA Yes ❑No ❑NA (AYes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> BP Arco # 6347 <br /> 2430 Joe Pombo Pkwy <br /> Tracy, Ca 95377 <br /> SB 989 Testing <br />
The URL can be used to link to this page
Your browser does not support the video tag.