My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 2:56:37 PM
Creation date
6/23/2020 6:57:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUNI&ORAGE TANK MONITORING SYSTE RTIFICATION <br /> F. In-Tank Ganging/SIR Equipment: Permit Number: <br /> ❑ Check this box if tank gauging is used only for inventory control <br /> ❑ Check this box if no tarsi:gauging or SIR�pmentasInstalled <br /> This section must be completed if in-t ' � u or equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wixzng ben inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes I ❑ No* Were all tank gauging robes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system;product level readings tested? <br /> ❑ Yes I ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes 10 No* j Were all probes reinstalled prope`31y? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below,d::scribe how and when these deficie)bo <br /> es were or will be corrected. <br /> G. Line Leak Detectors (LLD): Z! Check this if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual a ipment certification, was a leak simulated to verify LLD performance? <br /> ❑ NIA (Check all that apply) Simulated le rate: ❑3 g.p.h.; ❑0.1 g.p.h. ❑0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed opera oral and accurate within regulatory.requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus prop ly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does.the LD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if. the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? \1 11 <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ NIA or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually.inspected? <br /> ❑ NIA ° <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,-describe-how and-when these deficiencies were or will be corrected. <br /> f. <br /> H. Comments: <br /> 17 <br /> DEME M,-9301.(Rev 08/02). .. 'age 3 of 4 County o€San Diego-DEH-Hazardous Materials Division, <br />
The URL can be used to link to this page
Your browser does not support the video tag.