My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 2:56:37 PM
Creation date
6/23/2020 6:57:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br />As requested by the inspector during the inspection, I have included a copy of the revised MRP <br />for agency approval (Attachment B). I would also like to request the ordinance code that requires <br />the type of overfill protection at the facility to be included in the MRP. <br />• HSC 25284.2 — The 87 master spill buckets failed the hydrostatic test. <br />The Inspection Report states that at the time of the inspection, the spill containments for the <br />unleaded underground storage tank (UST) failed the hydrostatic test. <br />On October 5, 2006, a contractor, Gettler Ryan, was onsite to address the Stage I issues at the <br />facility. The contractor submitted the appropriate permits with San Joaquin Environmental <br />Health Department (EHD) on October 16, 2006 and is awaiting approval from the San Joaquin <br />EHD. Upon approval of the submitted permits from the San Joaquin, the contractor will repair <br />the two spill containment. In addition, the testing contractor, Tanknology, will return to the site, <br />in coordination with San Joaquin EHD, to complete the hydrostatic test of the two repaired spill <br />containments. <br />It is BP West Coast Products' policy to address deficiencies, issues of concern, and/or agency <br />request regarding our gasoline retail facilities immediately. With the transmittal of this letter, it is <br />our understanding that the items of alleged non-compliance associated with the inspection <br />conducted on October 5, 2006 have been resolved. If this is not correct, please contact me as <br />soon as possible. <br />Sincerely, <br />X�� <br />Ruth K. Ha <br />Environmental Compliance Specialist <br />BP West Coast Retail Business Unit <br />Attachment: Inspection Report dated October 5, 2006 <br />Monitoring and Response Plan dated October 22, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.