Laserfiche WebLink
i ONITORING SYSTEM CERTIFICATION <br /> 7RPVse By All Jurisdictions Within the State of Califom <br /> Authority Cited:Chapter 6.7,Health and Safety Code;Chapter 16,Division 3 Title 23, lifornia Code of Regulations <br /> This form must be used to document testing and servicing of monitoring equipment. If more than one monitoring system control panel is installed at the facility,a separate <br /> certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank <br /> system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date. <br /> A.General Information <br /> Facility Name: 7-ELEVEN#32262 City: TRACY CA Zip:95376 <br /> Site Address: 2360 GRANTLINE,1-205 OFF RAMP Contact Phone No:830-9917 <br /> MARKET#2237 Date of Testing/Service: 05/15/2002 <br /> Facility Contact Person: CHANDRA <br /> Make/Model of Monitoring System: VR TLS-350 Work Order Number: 2222223 <br /> B.Inventory of Equipment Tested/Certifled <br /> Check the appropriate boxes to indicate specific equipment inspected/serviced <br /> Tank ID: REG Tank ID: PLUS <br /> X In-Tank Gauging Probe. Model: 847380-109 X In-Tank Gauging Probe. Model: 847380-109 <br /> X Annular Space or Vault Sensor. Model: 794390-420 21 Annular Space or Vault Sensor. Model: 794390-420 <br /> X Piping Sump/Trench Sensor(s). Model: 794380-352 Piping Sumpffrench Sensor(s). Model: 794380-352 <br /> Fill Sump Sensor(s). Model: Fill Sump Sensor(s). Model: <br /> Mechanical Line Leak Detector. Model: LD-2000 Mechanical Line Leak Detector. Model: LD-2000 <br /> Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model: <br /> Tank Overfill/High-Level Sensor. Model: 61 SO X Tank Overfill/High-Level Sensor. Model: 61 SO <br /> Other(specify equipment type and model in Section E on page 2). Other(specify equipment type and model in Section E on page 2). <br /> Tank ID: Tank ID: <br /> R1 In-Tank Gauging Probe. Model: 847380-109 In-Tank Gauging Probe. Model: <br /> X Annular Space or Vault Sensor. Model: 794390-420 Annular Space or Vault Sensor. Model: <br /> X Piping Sump/Trench Sensor(s). Model: 794380-352 Piping SumpfTrench Sensor(s). Model: <br /> Fill Sump Sensor(s). Model: Fill Sump Sensor(s). Model: <br /> X Mechanical Line Leak Detector. Model: LD-2000 Mechanical Line Leak Detector. Model: <br /> Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model: <br /> X Tank Overfill/High-Level Sensor. Model: 61 SO Tank Overfill/High-Level Sensor. Model: <br /> Other(specify equipment type and model in Section E on page 2). Other(specify equipment type and model in Section E on page 2). <br /> Dispenser : 1/2 Dispenser ID: 7/8 <br /> 3q Dispenser Containment Sensor(s) Model:794380-352 _X-1 Dispenser Containment Sensor(s) Model:794380-352 <br /> X�Shear Valve(s). X Shear Valve(s) <br /> Dispenser Containment Float(s)and Chain(s). Dispenser Containment Float(s)and Chain(s). <br /> Dispenser ID: 3/4 Dispenser ID: 9/10 <br /> MDispenser Containment Sensor(s) Model:794380-352 71 Dispenser Containment Sensor(s). Model:794380-352 <br /> X Shear VaNe(s). Shear Valve(s). <br /> Dispenser Containment Float(s)and Chain(s). 71 Dispenser Containment Float(s)and Chain(s). <br /> Dispenser ID: 5/6 Dispenser ID: <br /> ® Dispenser Containment Sensor(s) Model:794380-352 X Dispenser Containment Sensor(s). Model:794380-352 <br /> X Shear Valve(s). X Shear Valve(s). <br /> 10 Dispenser Containment Float(s)and Chain(s). Dispenser Containment Float(s)and Chain(s). <br /> *If the facility contains more tanks or dispensers,copy this form.Include information for every tank and dispenser at the facility. <br /> C. Certification <br /> I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers'guidelines. <br /> Attached to this certification is information(e.g manufacturers'checklists)necessary to verify that this information is correct. <br /> and a Site Plan showing the layout of monitoring equipment.For any equipment capable of generating such reports,I have also attached <br /> a copy of the(Check all that apply): System set-up report; Alarm history report <br /> PRINTED NAMEPICHAEL T LEVESQUE SIGNATURE: <br /> COMPANY: Tanknology PHONE NO: (800)800-4633 <br /> page 1 of 3 Based on CA form dated 03/01 <br />