Laserfiche WebLink
nitoring System Certification <br /> Site Address: 2360 GRANTLINE, 1-205 OFF RAMP Date of Testing/Service: 05/22/2001 <br /> MARKET#2237 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: N/A <br /> Complete the following checklist: <br /> ® Yes [—]No" Is the audible alarm operational? <br /> ® Yes F-1 No* Is the visual alarm operational? <br /> ® Yes F-1 No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes No <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> ❑ <br /> interfere with their proper operation? <br /> El Yes No* N/A If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> Yes ❑No* ®N/A monitoring system detects a leak,fails to operate, or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down(check all that apply) ( Sump/Trench Sensors; Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to teaks and sensor failure/disconnection?pq Yes pNo <br /> E Yes ®No* ❑N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical <br /> overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes ®No* Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ® Yes ®No° Was liquid found inside any secondary containment systems designed as dry systems?(check all that applr]Product; <br /> ® WaterJf yes,describe causes in Section E,below. <br /> ® Yes No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes ❑No* Is all monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these decifiences were or will be corrected. <br /> E. Comments: <br /> page 2 of 3 <br />