My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_1997-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 3:34:59 PM
Creation date
6/23/2020 6:57:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2003
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507204_2360 W GRANT LINE_1997-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
onitoring System Certification 41 <br /> Site Address: 2360 GRANTLINE, 1-205 OFF RAMP Date of Testing/Service: 05/22/2001 <br /> MARKET#2237 <br /> F. In-Tank Gauging /SIR Equipment ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in tank gauging equipment is used to preform leak detection monitoring <br /> Complete the following checklist: <br /> ❑ Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑No• Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑No* Was the accuracy of system product level readings tested? <br /> ❑Yes ❑No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑No, Were all probes reinstalled properly? <br /> ❑ Yes EjNo-I Were all items on the equipment manufacturers maintenance checklist completed? <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ® Yes ®No* ❑N/A (Check all that apply)Simulated leak rate:®3 g.p.h®0.1 g.p.h ❑0.2 g.p.h <br /> ® Yes ®No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑No* Was the testing apparatus properly calibrated? <br /> ®Yes ❑No* ❑ N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes [:]No* ® N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ❑No* ® N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected. <br /> Yes No* P9 N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes ❑No* ® N/A or electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑Yes ®No* Nere all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> NO POSITIVE SHUTDOWN. NO SENSOR OUT SHUTDOWN, NO MAINTENANCE CHECKLIST. <br /> page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.